Search Results


Page 3 of at least 75
About 1,400 Items

View:
Two views of the foundation of farm manager's chicken house prior to restoration Structures, Exterior H.S. #29, Chicken House (Farm Manager's). Two views of the foundation of farm manager's chicken house prior to restoration.
Two views of preparation of under columns of front porch during restoration Structures, Exterior (H. S. #1), Main House, Front Porch. Two views of preparation of under columns of front porch during restoration.
View on map 
1974-01
View shows Glen Barnwell working on the roof of the buck house during restoration Structures, Exterior (HS 21) Buck House. View shows Glen Barnwell working on the roof of the Buck House during restoration.
View on map 
1975-10
View of buck house showing south side and east side prior to restoration Structures, Exterior (HS 21) Buck House. View of Buck House showing south side and east side prior to restoration.
View on map 
1972-06-02
View shows north front side of the buck house as drainage is being poured Structures, Exterior (HS 21) Buck House. View shows north front side of the Buck House as drainage is being poured.
View on map 
1976-02-19
Replacing drainpipes and filling in during the stabilization of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Replacing drainpipes and filling in during the stabilization of the Main House.
View on map 
1979-08
View of part of the foundation of the Farm Manager's house prior to restoration Structures: Exterior; (H.S. #11), Farm Manger's House. View of part of the foundation of the Farm Manager's House prior to restoration.
Four views of the installation of the plumbing of the tenant house during reconstruction Structures, ExteriorH. S. #4, Tenant House. Four views of the installation of the plumbing of the tenant house during reconstruction.
View on map 
1975-05
View of the corner foundation at the back of the Chicken House prior to restoration Structures, ExteriorH. S. #5, Chicken House. View of the corner foundation at the back of the Chicken House prior to restoration.
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Two views of the side and front of Farm Manager's chicken house prior to restoration Structures, Exterior H.S. #29, Chicken House (Farm Manager's). Two views of the side and front of Farm Manager's chicken house prior to restoration.
Two views of painting of exterior of Tenant House during restoration Summer 1975 - note oil tank Structures, Exterior(H. S. #4), Tenant House. Two views of painting of exterior of Tenant House during restoration Summer 1975 - note oil tank.
View on map 
1975-07
Two views showing the painting of the back porch of the Farm Manager's house during restoration Structures: Exterior; (H.S. #11), Farm Manger's House. Two views showing the painting of the back porch of the Farm Manager's House during restoration.
View on map 
1975-10
Photograph of the thermometer on the tree in the barn area, temperature a little above 30 degrees Structures, Exterior H.S. 13a, Barnyard Cluster. Photograph of the thermometer on the tree in the barn area, temperature a little above 30 degrees.
View on map 
1978-12
Completion of the restoration of the goat yard of the Main House, Charlie Hamn and other worker at work X-Restoration ActivitiesHS1, Main House House. Completion of the restoration of the goat yard of the Main House. Charlie Hamn and other worker at work.
Two different views of the porch of the Farm Manager's house after porch floor has been removed for restoration Structures, Exterior H.S. #11, Farm Manager's House. Two different views of the porch of farm manager's house after porch floor has been removed for restoration.
View on map 
1975-03
Stabilization of pillars of front porch of the Main House during restoration. Note braces used before pouring of concrete Structures, Exterior (H. S. #1), Main House, Front Porch. Stabilization of pillzard of front porch of the Main House during restoration. Note braces used before pouring of concrete.
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Barn garage restoration in progress, deteriorated roofing members are shown. Workers in the photograph are Charlie Hamn (left) and Lewis Smith, laborer, on right Restoration Activites - Barn Garage; HS 13, Barn Garage. Barn Garage - Restoration in progress. Dteriorated roofing members are show. Wokers in the photgraph are: Charlie Hamn (left) and Lewis Smith, laborer (on right).
View on map 
1972-01

Page 3 of at least 75
About 1,400 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University