Search Results


Page 2 of 2
178 Items

View:
Four Views of the foundation of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Four Views of the foundation of the Swedish House during restoration.
View on map 
1976-12
Foundation and walls built with cinder blocks during construction, Headquarters area Great Smoky Mountains National Park Foundation and block-type exterior walls during construction. Note steel I-Beam on pope posts for interior support of second floor. Completion report.Quarters No. 496; Headquarters Area, II-B-(7)-3995, Physical Facilities - Buildings - Leaseholder buildings
Yellowstone photo album 11, page 65 Yellowstone National Park
Parade wood plank foundation for parade wall, Fort Moultrie, South Carolina National Park Service FOMO Parade wood plank foundation for parade wall; 7-74; 1.d.
Piping and foundation ditch of Smokemont Campground Store, North Carolina, 1958 Great Smoky Mountains National Park Construction. Piping and foundation ditch. Smokemont Campground Store; Building No. 429, II-B-(6)-3368, Physical Facilities - Buildings - Permittee and Concessioner buildings
View on map 
1958-08-13
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Three views of the foundation of the Swedish House during restoration- corner reinforcement Structures, Exterior, Swedish House (H.S. #3). Three views of the foundation of the Swedish House during restoration- corner reinforcement.
View on map 
1977-04
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Three views of the foundation of the Swedish House during restoration- corner reinforcement Structures, Exterior, Swedish House (H.S. #3). Three views of the foundation of the Swedish House during restoration- corner reinforcement.
View on map 
1977-04
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Three views of the foundation of the Swedish House during restoration- corner reinforcement Structures, Exterior, Swedish House (H.S. #3). Three views of the foundation of the Swedish House during restoration- corner reinforcement.
View on map 
1977-04
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Preparation of the foundation of the chimney of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation of the chimney of the Swedish House during restoration.
View on map 
1977-04
North area wood platforms of 1830 hospital foundation, Fort Moultrie, South Carolina National Park Service FOMO North area wood platforms 1830 hospital foundation; 6-74; 1.e.; SEP 74R.
Repairing road at Fighting Creek Gap on Little River Road, Tennessee, 1974 Great Smoky Mountains National Park Rebuilding the road near Fighting Creek Gap as a result of a slide.Repair of Slide, II-R-Maint-17650
View on map 
1974-06
Preparation of the foundation of the chimney of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation of the chimney of the Swedish House during restoration.
View on map 
1977-04
Twentymile Ranger Station, Building No. 80, construction, foundation poured Great Smoky Mountains National Park II-B-(1)-1592, Physical Facilities - Buildings - Administrative buildings (ranger stations and outbuildings; warden stations; fire towers; checking stations; Geological Survey gauging stations; possession cabin,Twentymile Ranger Station; Building No. 80, Construction. Foundation poured.
1948
Glenn Barnwell and one of the men working on the foundation of Swedish House Structures, Exterior, Swedish House (H.S. #3). Glenn Barnwell and one of the men working on the foundation of swedish house.
View on map 
1977-04
Cinder blocks laid in ditch for foundation of fireplace, Smokemont Campground Store, North Carolina, 1958 Great Smoky Mountains National Park Construction. Fireplace with block foundation. Smokemont Campground Store; Building No. 429, II-B-(6)-3369, Physical Facilities - Buildings - Permittee and Concessioner buildings
View on map 
1958-08-16
Section of the Main House exposed during the stabilization of the foundation Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the Main House exposed during the stabilization of the foundation.
View on map 
1979-08
Replacing drainpipes and filling in during the stabilization of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Replacing drainpipes and filling in during the stabilization of the Main House.
View on map 
1979-08
Parade wood plank foundations for brick parade wall, Fort Moultrie, South Carolina, 1874 National Park Service FOMO Parade wood plank foundations for parade wall; 7-74; 1.d.
View on map 
1874-07
Hole in ground showing foundation of brick wall, Fort Moultrie, South Carolina, 1873 National Park Service Foundation of wall at FOMO; 3H; OCT73A5 19.
View on map 
1873-10
Yellowstone photo album 11, page 70 Yellowstone National Park
Photo of Charles Hamm and Alexander Carlone working on the Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Photo of Charles Hamm and Alexander Carlone working on the Foundation of the Swedish House.
View on map 
1977-04
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
North area reclaimed wood used for 1830 hospital foundation, Fort Moultrie, South Carolina National Park Service FOMO North Area reclaimed wood used for 1830 hospital foundation; 6-74; 1.e.; D.L.
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
North area wood platforms for 1830 hospital foundations with pipes throughout, Fort Moultrie, South Carolina, 1874 National Park Service FOMO North area wood platforms for 1830 hospital foundations; 6-74; 1.c.; D.L.
View on map 
1874-06
Certificate of Honorary Membership to the Lincoln Farm Association, 1909 Abraham Lincoln Birthplace National Historical Park Certificates were issued to those who donated between .25 cents and $25 to the building of the Abraham Lincoln Birthplace Memorial.
View on map 
1909-05-15
Photo of Rick Hefner working on the foundation of the Swedish House during restoration Structures, Exterior H.S. #3, Swedish House X-Biography-Park-Personnel. Photo of Rick Hefner working on the foundation of the Swedish House during restoration.
View on map 
1976-12
View of installation of drainpipe during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of installation of drainpipe during the stabilization of the foundation of the Main House.
View on map 
1979-08
Installation of drainpipe during the stabilization of foundation of Main House in back of house Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Installation of drainpipe during the stabilization of foundation of Main House in back of house.
View on map 
1979-08
Installation of drainpipe during the stabilization of foundation of Main House in back of house Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Installation of drainpipe during the stabilization of foundation of Main House in back of house.
View on map 
1979-08
Section of pipe being used in the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe being used in the stabilization of the foundation of the Main House.
View on map 
1979-08
North area wood platform from 1830's hospital below 20th century hospital foundation, Fort Moultrie, South Carolina National Park Service FOMO north area wood platform from 1830's hospital below 20th cent hospital foundation; 6-74; 1.c.; D.L.
East area joint of timber foundations forming 60 degree angle, Fort Moultrie, South Carolina National Park Service FOMO East area joint of timber foundations form 60 degrees; 6-74; 1.c.; D.L.
Three men working on foundation of construction, Frye Mountain Fire Tower Cabin, North Carolina Great Smoky Mountains National Park Construction: foundation.Frye Mountain Fire Tower Cabin, II-B-(1)-3126, Physical Facilities - Buildings - Administrative buildings (ranger stations and outbuildings; warden stations; fire towers; checking stations; Geological Survey gauging stations; possession cabin
East area post and post mold east of timber foundation with sign to left, Fort Moultrie, South Carolina, 1874 National Park Service FOMO East area post and post mold east of timber foundation; 6-74; 1.e.
View on map 
1874-06-17
Charles Hamm, Superintendent of Building and Grounds, and some of the crew working on the foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Charles Hamm, Superintendent of Building and Grounds, and some of the crew working on the foundation of the Swedish House.
View on map 
1977-04
Bookkeepers at work in office of Lincoln Farm Association Treasurer, Clarence H. Mackay, New York, NY Abraham Lincoln Birthplace National Historical Park Donations for the creation of the Abraham Lincoln Birthplace Memorial were sent to Mr. Clarence H. MacKay, Treasurer Lincoln Farm Associate, 74 Broadway, N. Y.
View on map 
Circa 1909
Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House.
View on map 
1979-08
Alexander Carlone, mason, preparing to repoint stone and brick-work during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities X- Biography-Park Personnel. Alexander Carlone, mason, preparing to repoint stone and brick-work during the stabilization of the foundation of the Main House.
View on map 
1979-08
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Preparation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Photo taken during the stabilization of the Main House- excavation, examination, repointing stone, painting brick, replacing drainpipes, filling in with the gravel and filling with dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo taken during the stabilization of the Main House- excavation, examination, repointing stone, painting brick, replacing drainpipes, filling in with the gravel and filling with dirt.
View on map 
1979-08
Preparation of the foundation of the Main House on the west side for stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preparation of the foundation of the Main House on the west side for stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacing drainpipes, and filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacining drainpipes, and filling with gravel and dirt.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
Yanna Fishman, laborer, working in the excavation of the foundation of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities X- Biography-Park Personnel. Yanna Fishman, laborer, working in the excavation of the foundation of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Walkway from the Main House to the Swedish House during the stabilization of the foundation of the Main House, note-pipe is the kind used in replacing pipes Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Walkway from the Main House to the Swedish House during the stabilization of the foundation of the Main House note-pipe is the kind used in replacing pipes.
View on map 
1979-08

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University