Yellowstone photo album 11, page 69
Yellowstone National Park
Item Details
Dates
Date Created
TranscriptionYELL192993-393 parts and eqiptment for bridge. Black tail 8-17-36 Danecki. 14396-8; YELL1929993-398 Old Fire bridge at Pelican Creek. 14565-3; YELL192993-394 Preparing to hoist beam. Blacktail. August, 17, 1936, Danecki 14397-3; YELL192993-399 Old Fire bridge at Pelican Creek. 14565-2; YELL192993-395 Cletrac used for heavy hoisting. Blacktail. August 17, 1936, Danecki. 14397-6; YELL192993-396 Beam on Concrete base, Blacktail, 8-17-36, Danecki. 14397-8; YELL192993-400 Bridge under construction Ner Lake Ranger Station Gish 6/20/34 14034-6; YELL192993-397 Sopport for heavy cable. Lower black tail 8-31-36 Danecki. 14438-3
LocationsYellowstone National Park, Park County, Wyoming, United States(44.59644,-110.5472)
Blacktail Deer Creek, Park County, Wyoming, United States(44.99605,-110.57659)
Pelican Creek, Park County, Wyoming, United States(44.55328,-110.3602)
Lake Ranger Station, Teton County, Wyoming, United States(44.55105,-110.39548)
Blacktail Deer Creek, Park County, Wyoming, United States(44.99605,-110.57659)
Pelican Creek, Park County, Wyoming, United States(44.55328,-110.3602)
Lake Ranger Station, Teton County, Wyoming, United States(44.55105,-110.39548)
TopicsYellowstone National Park
Bridges
Suspension bridges
Bridges--Design and construction
Tracklaying vehicles
Mountains
Wooden bridges
Rivers
Trees
Bridges
Suspension bridges
Bridges--Design and construction
Tracklaying vehicles
Mountains
Wooden bridges
Rivers
Trees
Physical Descriptions
Mediumphotograph albums; black-and-white prints (photographs)
Contributing Institutions
Identifiers
Digital IdentifierYELL_11_069
Permanent Linkhttp://purl.clemson.edu/3BCB7B7C3CDD0AB2A4B005F0CF98713E
Batch ID20160801191720