TranscriptionYELL20560 (1935) FP 598 Mammoth Water & Power Project. Penstock trench from survey sta. 98-50 through Mammoth Lodge Area. Trench excavated to ave. depth 3 ft. Note tunnel under cabin in background. 11235-2; YELL39934 Mammoth Sewer. Mammoth. 6-32 -Lord 11121-4; YELL39945 6'' discharge pipe from pumping plant Auto Camp. Fishing Bridge Sewage System. June, 1935. -Wiggins. 13063-1; YELL192994-80 Water main from spring Tower Falls water system. Antelope Creek. Aug., 1935 -Wiggins. 13068-2; YELL39934 Mammoth Sewer. Mammoth. 6-32 -Lord 11121-5; YELL39946 6'' discharge pipe from pumping plant Auto Camp. Fishing Bridge Sewage System looking north. 6/35 -W.W. 13063-2; YELL41769 Tower Falls Water Supply - New 2'' water main from spring to Antelope Creek Water System. 6/35 -W.W. 13067-3; YELL123274 East Entrance new Water main East Entrance Water System, east from reservoir. Aug., '35 -W.W. 13068-3
Physical Descriptions
Mediumphotograph albums; black-and-white prints (photographs)
Contributing Institutions
Identifiers
Digital IdentifierYELL_12_101
Permanent Linkhttp://purl.clemson.edu/548D52BFB10CF273221ECB1BB4CF3FC7
Batch ID20160801191720