Descriptive InformationThis work was done in the winter or spring of 1934...All the debris, both large and fine, was removed from the side of the trail for 100 feet and left a windrow. This work was not supervised by a forestry foreman at the time. At present, it is so matted that scattering is impossible. It is being burned with some damage to the vegetation. By starting the burning at one end of the windrow, the head it kept as low as possible. Mt. Cammerer (White Rock) Trail Clean-Up, II-Th-5232, Physical Facilities - Trails - Horse Trails