Search Results


Page 13 of at least 18
About 1,700 Items

View:
Yellowstone photo album 22, page 20 Yellowstone National Park
Yellowstone photo album 20, page 3 Yellowstone National Park
Colonial Dorchester State Historic Site, South Carolina South Carolina Department of Parks, Recreation and Tourism Old Dorchester OD-20 Forestry Comm. neg. CWJ- May 1961 Fort
View on map 
1961-05
Cannon with residential area in background National Park Service FM-255 Ft. Moultrie 1 S.EV. corner 10-20-66 5c.
Yellowstone photo album 20, page 77 Yellowstone National Park
Yellowstone photo album 20, page 6 Yellowstone National Park
Yellowstone photo album 20, page 76 Yellowstone National Park
Yellowstone photo album 20, page 41 Yellowstone National Park
Poinsett State Park, South Carolina South Carolina Department of Parks, Recreation and Tourism PO-20 Poinsett State Park Boat landing & lake National Graflex April, 1947 J. R. Tiller SCSCF
View on map 
1947-04
Yellowstone photo album 20, page 96 Yellowstone National Park
Yellowstone photo album 20, page 7 Yellowstone National Park
Yellowstone photo album 25, page 20 Yellowstone National Park
Deer feed plot, Beidler Tract, Road H, Congaree National Park, 1977 Congaree National Park Congaree Swamp N M, Deer Feed Plot - Beidler Tract E of Brandenburg Tract, Road H-1, 10/20/77 AC
View on map 
1977-10-20
Through the Years, page 20 South Carolina State Parks Poinsett: 1957. Seated: Binks Ravenel (Assistant Director), Sheriff Leroy (Greenwood), Ernie Mobley (Rivers Bridge), Marion Dwight (Poinsett), Bill Wiggins (Givhans Ferry), Bob Jones (Table Rock), Van Pressley (Lee), Marshal Holder (Sesquicentennial), L. Storm Bailey (Edisto), Claude Barton (Forestry Information and Education), Red La Boon (Santee), Ted Barbie (Myrtle Beach), Clarence Doster (Chester), Ray Sisk (Kings Mountain), Eddie Miller (Paris Mountain). Standing: Charles Flory (State Forester), Del Furney (Forestry Purchasing), West Jacocks (Park Director), Norman Cooler (Hunting Island), Carl Foxworth (Aiken), Jake Ray (Oconee), LaFon Norton (Little Pee Dee), Lorine Davis (Secretary), Capt. Nelson (Bookkeeper), Virginia Holmes (Personnel), Gene Price (Assistant State Forester), Mrs. D. I. Ross (Barnwell), George Holder (Cheraw), E. R. Vreeland (Assistant Director). Not In Photo: J. E. Thornton (Croft), Willard Risher (Colleton Wayside), Leroy Smith (Pleasant Ridge).
Yellowstone photo album 20, page 28 Yellowstone National Park
Yellowstone photo album 20, page 47 Yellowstone National Park
Paris Mountain State Park, South Carolina South Carolina Department of Parks, Recreation and Tourism PM-20 Paris Mountain State Park Three people on nature trail June, 1954 JCW
View on map 
1954-06
David Del Condon wearing hat and holding arm in portrait Great Smoky Mountains National Park Publicity photograph made for Region One, in accordance with RI 59-129. Negative sent to Region One -5/20/1960.Condon, David deL. Assistant Superintendent, IV-P-3910, Miscellaneous - Personnel
Yellowstone photo album 20, page 88 Yellowstone National Park
Yellowstone photo album 20, page 19 Yellowstone National Park
Yellowstone photo album 21, page 82 Yellowstone National Park
Little Pee Dee State Park, South Carolina South Carolina Department of Parks, Recreation and Tourism Little Pee Dee State Park; Construction on Dam; July, 1952; CWJ; LP-20
View on map 
1952-07
Dry Branch entering Weston Lake, Congaree National Park, 1977 Congaree National Park Congaree Swamp NM, End of Road from Brandenburg in Beidler Tract, Dry Banch Entering Weston Lake 10/20/77 PS Rd H
View on map 
1977-10-20
Building 15, Susan Downey House, Harpers Ferry National Historical Park Harpers Ferry National Historical Park Building #15; Porch and toilet addition to the Susan Downey House. Original caption: NHF 291, BLDG #15, Porch and Toliet Addition to the Susan Downey House, 1957, Feb 20, 1957.
Yellowstone photo album 20, page 15 Yellowstone National Park
Toms creek view from Kingville Access, Congaree National Park, South Carolina Congaree National Park Toms Creek - View S from Kingville Access. Location just N of NE Boundary of Beidler Tract; PFS 10/20/77; NPS-350-C
Building 15, Susan Downey House, Harpers Ferry National Historical Park Harpers Ferry National Historical Park Building #15 -Susan Downey House -South Side shows porch and toilet, addition. Original caption: NHF 292, BLDG #15, Susan Downey House South Side; Shows Porch & Toliet Addition, Feb 20, 1957.
View on map 
1957-02-20
Yellowstone photo album 20, page 46 Yellowstone National Park
Yellowstone photo album 20, page 37 Yellowstone National Park
Trees, Weston Lake, Congaree National Park, South Carolina Congaree National Park Dry Branch entering Weston lake - this view from Terminos_ of Old Road Trace from Brandenburg Tract - Road H- View SSW; PFS 10/20/77; NPS-343-C
Oconaluftee Job and Superintend John Cook Great Smoky Mountains National Park Supervisory Group Leader, Oconaluftee Job corps, receives 20 year service pin from Supt. John Cook.Myers, Sidney, IV-P-16874, Miscellaneous - Personnel
View on map 
1983-05-17
Yellowstone photo album 15, page 175 Yellowstone National Park
Circa 1939
View series 
Building 15, Susan Downey House, Harpers Ferry National Historical Park Harpers Ferry National Historical Park Building #15 -Susan Downey House -South Side shows porch and toilet, addition. Original caption: NHF 294, BLDG #15, Susan Downey House, South Side; Shows Porch & Toliet Addition, Feb 20, 1957.
View on map 
1957-02-20
Building 15, Susan Downey House, Harpers Ferry National Historical Park Harpers Ferry National Historical Park Building #15 -Susan Downey House -South Side shows porch and toilet, addition. Original caption: NHF 293, BLDG #15, Susan Downey House, South Side; Shows Porch & Toliet Addition, Feb 20, 1957.
View on map 
1957-02-20
Rose Hill Plantation State Historic Site, South Carolina South Carolina Department of Parks, Recreation and Tourism RH-13; Rose Hill; Programs & Events; Dedication of Rose Hill; Dec 20 1960; CFB.""
View on map 
1960-12-20
Frank Hyatt, Porter Stephenson, William L Huskey Great Smoky Mountains National Park Frank Hyatt, 10 year pin. Porter Stephenson, Special Achievement award and $150. William L. Huskey, 20 year pin.Awards, IV-P-16029, Miscellaneous - Personnel
View on map 
1974-04
Wager House room 1 Harpers Ferry National Historical Park Wager House Rm. #1. Note markings of earlier stair to basmen. Original caption: NHF 132, Wager House, Room 1, Note Markings of Earlier Stair to Basement That Was Revealed by Removing Later Plaster Coat, 12/20/56.
View on map 
1956-12-20
Rose Hill Plantation State Historic Site, South Carolina South Carolina Department of Parks, Recreation and Tourism Gist Cemetery; Rose Hill Plantation; Return to: S.C. State Parks 1205 Pendleton Street Columbia, S.C. 29201; Mar70A6; 20
Snow covered road, near Newfound gap, Tennessee Great Smoky Mountains National Park Near Newfound Gap on US-441 snow removal after storm of 2/20.Snow, I-A-MR-7867, Natural Features - Mountains - Views from Newfound Gap and Clingmans
View on map 
1964-02-21
Special achievement award, to Hyatt, from Superintend John Cook Great Smoky Mountains National Park Supt. John Cook presents Hyatt, South District Facility Manager, a 20 year length-of-service pin.Hyatt, Frank, IV-P-16962, Miscellaneous - Personnel
View on map 
1984-03-20
Park employees on swamp buggy pulling trailer through slough, September 20 1965 Everglades National Park; National Park Service Close up view of park employees on swamp buggy pulling trailer through slough; "Tiokol 'Imp' pulling loaded trailer"; "Film: Royal Pan (ASA 400); Equipment". Polyester Copy Negative.
View on map 
1965-09-20
Burnside Tract west of Hunt Club, Congaree National Park, South Carolina Congaree National Park Burnside Tract west of Hunt Club access road North of Beidler Tract and on N. Bluff - Views from Road E South KG 10/20/77; View W; C-1-2
Aerial view, shade structure surroundings, after storm, Coquina Beach, North Carolina, 1962 Cape Hatteras National Seashore Coquina Beach shade structure surroundings after storm of March 7, 1962 view looking west #11 Neg. 20 3/9/62 Yes Cape Hatteras NSRA. Coquina Beach shade structure & surroundings after storm of 62.
View on map 
1962-03
General view, Pioneer farmstead Great Smoky Mountains National Park 16 x 20" mural in museum. Note sign in foreground.",Pioneer Farmstead; General view from Highway, II-B-(5)-Ocon-9651, Physical Facilities - Buildings - Historic buildings being preserved - Oconaluftee pioneer, Farmstead buildings
View on map 
1955-02
Traffic, Harpers Ferry, West Virginia Harpers Ferry National Historical Park Traffic-Tourists. Picnic Area Beyond Parking Lot on. Visit to H.F. by 200. Original caption: Park: HFNHP; NEGATIVE NO: NHF-2816; Subject: TRAFFIC-TOURISTS ; Location: Picnic area beyond Parking lot on Shen Street ; Purpose: Visit to HF by 200 diplomatic familied from DC (3 pass cars) Sen Jennings Randolph and Bradley D Nash holding box lunches; photographer and companions: Bill Clark, C&O Canal; DATE: 9/25/65.
View on map 
1965-09-25
Trail at Dudley Creek horse concession Great Smoky Mountains National Park Typical photo of horse trail constructed for the horse concession operation. Work Order No. R-20 GSM, roads, parking area and trails for horse concession, Dudley Creek. Completion report photo.Dudley Creek Horse Concession Trail, II-HC-DC-14311, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1964-10-15
Tide pools, Cape Hatteras National Seashore, North Carolina Cape Hatteras National Seashore Tidal pond among the dunes of the barrier ridge. These ponds when adjacent to the road seep water onto it often for many days following periods of heavy storm tides such as NE of 10/19-20.
View on map 
1958-10-26
View of Harpers Ferry, West Virginia Harpers Ferry National Historical Park 14" d.b.h. Virginia Pine girdled at base, 4x5 negative filed. 20' W of W wall Episcopal Church Ruins. Original caption: NHF 12, Harper House Porch from Stone Steps before Porch Removal, Jan 1955. NHF-1494, 144 D.B.H. Virginia Pine GIrdled at base, Location: 20' West of West Episcopal ruins, 4x5 Negative Filed, Decembr 1959.
View on map 
1959-12
Rose Hill Plantation State Historic Site, South Carolina South Carolina Department of Parks, Recreation and Tourism RH-74; Collections; Forestry Commission Neg.; Display on Confederate arms and uniforms displayed at the dedication of Rose Hill --Dec. 20 1960; CFB.""
View on map 
1960-12-20
Rose Hill Plantation State Historic Site, South Carolina South Carolina Department of Parks, Recreation and Tourism RH-77; Collections; For. Comm. Neg.; Display on Confederate arms and uniforms displayed at the dedication of Rose Hill Dec. 20 1960; CFB""
View on map 
1960-12-20
Orders from Gillmore to Major Brooks, November 20 1863 National Park Service Orders from General Gillmore to Brooks, telling Brooks to proceed to Washington City as bearer of dispatches to the General-in-Chief, and that the Steamer Delaware is at Brooks' disposal.
Bridge No. 4, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 4 spans- 13'x7', 17'x6', 12'x6', 22'x6', south to north; skew 30 degrees; width 10.2'; area waterway 370 SF; Abutments: Log cribs; Intermediate Supports: 12 to 16 on logs on mud sills; Superstructures: Each span: 3 - 12 to 20 log stringers; deck of 3 plank; Condition: Abutments, fair; stringers, good; bents, fair; deck, good; Estimate: $3, 900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 4, main channel, Forney Creek, II-F-(5)-11269, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 6, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span- 20'x4'; skew 10 degrees; width 10.3'; Abutments: 12 half-log stills on U-type HPRE; Superstructure: 4 - 12 to 14 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 20'x4'; Estimates: $1, 000.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 6, over Indian Creek, II-F-(5)-11263, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 6, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span- 20'x4'; skew 10 degrees; width 10.3'; Abutments: 12 half-log stills on U-type HPRE; Superstructure: 4 - 12 to 14 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 20'x4'; Estimates: $1, 000.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 6, over Indian Creek, II-F-(5)-11263, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 4, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 4 spans- 13'x7', 17'x6', 12'x6', 22'x6', south to north; skew 30 degrees; width 10.2'; area waterway 370 SF; Abutments: Log cribs; Intermediate Supports: 12 to 16 on logs on mud sills; Superstructures: Each span: 3 - 12 to 20 log stringers; deck of 3 plank; Condition: Abutments, fair; stringers, good; bents, fair; deck, good; Estimate: $3, 900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 4, main channel, Forney Creek, II-F-(5)-11270, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 6, over Lost Creek Great Smoky Mountains National Park Bridge No. 6, over Lost Creek; Dimensions: 1 span- 20' x 4', at right angles, width 10.5'; Abutment: 14 log sills; Superstructure: 3-14 to 16 log stringers; 3 plank deck; Condition: Abutment, veer poor; wheel guards, poor; rest of bridge, fair; Proposed: replace with steel stringers, wood deck- 1 span 10' x 4'; Estimate: $650,Bridge Maintenance Report of 1952; ELK-117, Little River Road, II-F-(5)-11182, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span - 18'x12'; skew 20 degrees; width 11'; Abutments: Cemented rough rubble: Superstructure: 4 - 8 x 4, steel I-beams; 2 - 12 to 14 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace deck and paint steel out of regular maintenance.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 1, over Indian Creek, II-F-(5)-11252, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11171, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11171, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11172, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Mingus Creek Great Smoky Mountains National Park Bridge No. 1, over Mingus Creek; Dimensions: 1 span- 20' x 2'; skew 30 degrees, L.F. width 11'; Abutments: Log crib; Superstructure: 4 log stringers, 12 to 14; split log deck; 3 plank runners; Condition: Deck, good; rest of bridge, fair; Proposed: Replace with steel stringers wood deck, 2 span 20' x 4'; Estimate: $2, 000,Bridge Maintenance Report of 1952; OCO-144, Mingus Creek Road, II-F-(5)-11214, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Dudley Creek horse concession bridge Great Smoky Mountains National Park Bridge over Dudley Creek on entrance road to the horse concession area. Work Order No. R-20 GSM: roads, parking area and trails for horse concession, Dudley Creek: Completion report photo. Dudley Creek Horse Concession Bridge, II-HC-DC-14306, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-10
Dudley Creek horse concession bridge Great Smoky Mountains National Park Bridge over Dudley Creek on entrance road to the horse concession area. Work Order No. R-20 GSM: roads, parking area and trails for horse concession, Dudley Creek: Completion report photo. Dudley Creek Horse Concession Bridge, II-HC-DC-14306, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-10
Bridge No. 4, over Indian Flats Prong Great Smoky Mountains National Park Bridge No. 4, over Indian Flats Prong; Dimensions: 3 spans- 21' x 12.5' 21' x 12.5', 20' x 12.5'; width 10.3'; Abutments: log sill on HPRE; Intermediate Support: Rock-filled log crib: Superstructure: 4-14 to 16 log stringers; 3 plank deck; Condition: As a whole, bridge in poor condition; Proposed: Replace with steel stringers, wood deck, 1 span 22' x 12'; Estimate $1, 100,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11176, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 4, over Indian Flats Prong Great Smoky Mountains National Park Bridge No. 4, over Indian Flats Prong; Dimensions: 3 spans- 21' x 12.5' 21' x 12.5', 20' x 12.5'; width 10.3'; Abutments: log sill on HPRE; Intermediate Support: Rock-filled log crib: Superstructure: 4-14 to 16 log stringers; 3 plank deck; Condition: As a whole, bridge in poor condition; Proposed: Replace with steel stringers, wood deck, 1 span 22' x 12'; Estimate $1, 100,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11176, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 4, over Indian Flats Prong Great Smoky Mountains National Park Bridge No. 4, over Indian Flats Prong; Dimensions: 3 spans- 21' x 12.5' 21' x 12.5', 20' x 12.5'; width 10.3'; Abutments: log sill on HPRE; Intermediate Support: Rock-filled log crib: Superstructure: 4-14 to 16 log stringers; 3 plank deck; Condition: As a whole, bridge in poor condition; Proposed: Replace with steel stringers, wood deck, 1 span 22' x 12'; Estimate $1, 100,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11175, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Two views of the horse barn showing dimensions, note silo, photo taken prior to restoration Structures, Exterior H.S. #17 Horse Barn And Silo (X-h. s #20 Silo). Two views of the Horse Barn showing dimensions. Also Note Silo. This photo taken prior to restoration.
View on map 
1972-06-02
Bridge No. 11, over Noland Creek Great Smoky Mountains National Park Dimensions: 2 spans- of 16'x4'; skew 20 degrees; WW 10'; area water-way 120 sq. ft. drainage area 8.5 sq. mi. Abutments: Log cribs reinforced by round timber bents resting on mud sills; Intermediate supports: Bent of 8 to 10, round timber on mud sills; Superstructure: Each span 5 to 10 log stringers, deck 4 hewed slabs; Condition: Bridge is in very poor condition; Proposed: Replace with steel stringers salvaged from other bridges, wood deck, 1 span 40'x4'; Estimate: $2, 500. Bridge Maintenance Report of 1952; FOR-155, Noland Creek Road; Bridge No. 11, over Noland Creek, II-F-(5)-11320, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 11, page 20 Yellowstone National Park
Yellowstone photo album 30, page 20 Yellowstone National Park
Dudley Creek horse concession new trail Great Smoky Mountains National Park Start of improved horse trail in right background. Horse barn on left side of photo. This trail provides the connection to the newly-constructed trail system for the horse concession operation. Work Order No. R-20 GSM, roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Trail, II-HC-DC-14309, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
New barn at Dudley Creek horse concession Great Smoky Mountains National Park Construction of horse barn by concessioner. The general area was cleared, filled, and graded before start of construction. Cut slopes, as at left, were fertilized and seeded to prevent erosion. Work Order No. R-20 GSM- roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Barn, II-HC-DC-14310, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
Hindquarters of nubian doe, Cathy, on cement milking stand Carl Sandburg Home National Historic Site Hindquarters of nubian doe, cathy. On cement milking stand with head, not shown, in white wooden stanchion in main goat barn. Leg of another goat is visible. Nine copies, carl 13720-13728. Negative carl 13729. In pencil on reverse, "20 prints this size." The 20 is written over 15.
Yellowstone photo album 19, page 20 Yellowstone National Park
New drainage at Dudley Creek horse concession parking area Great Smoky Mountains National Park Improved drainage along parking area, and channel extended beyond entrance road to junction with Dudley Creek. Work Order No. R-20 GSM; roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Parking Area, II-HC-DC-14308, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
Cannon Dry Tortugas National Park; National Park Service Back: ACC 29; I think this is about a 20 pounder. Darnels are Conn. I don't know the caliber of this or the gren at Guilford the pictures do provide a pretty good idea of the carriages regardless of size. They all appear about the same construction.
Tractor and crusher working on road from North Carolina Temp. 284 to Cataloochee campsite, Tractor and Crusher Great Smoky Mountains National Park ECW. Tractor and crusher working on road from North Carolina Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10882, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from North Carolina Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10882, Physical Facilities - Equipment
1935-05
Snow removal using jeep in Cherokee Orchard road, Gatlinburg, Tennessee Great Smoky Mountains National Park In the miscellaneous areas around the shops, at Twin Creeks and Cherokee Orchard, at the Visitor Centers, and at headquarters, the jeep is invaluable because of its mobility and flexibility. Here, the snow that fell during the February 18-20 storm is being cleaned from the Cherokee Orchard road. The jeep can efficiently handle snow up to about 12 inches.Snow Removal; February 1964 Monthly Report, II-R-SR-7894, Physical Facilities - Roads - Snow Removal Operations
Yellowstone photo album 1a, page 20 Yellowstone National Park
Yellowstone photo album 24, page 20 Yellowstone National Park

Page 13 of at least 18
About 1,700 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University