Search Results


Page 50 of at least 120
About 2,500 Items

View:
Bridge No. 4, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 4 spans- 13'x7', 17'x6', 12'x6', 22'x6', south to north; skew 30 degrees; width 10.2'; area waterway 370 SF; Abutments: Log cribs; Intermediate Supports: 12 to 16 on logs on mud sills; Superstructures: Each span: 3 - 12 to 20 log stringers; deck of 3 plank; Condition: Abutments, fair; stringers, good; bents, fair; deck, good; Estimate: $3, 900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 4, main channel, Forney Creek, II-F-(5)-11269, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 6, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span- 20'x4'; skew 10 degrees; width 10.3'; Abutments: 12 half-log stills on U-type HPRE; Superstructure: 4 - 12 to 14 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 20'x4'; Estimates: $1, 000.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 6, over Indian Creek, II-F-(5)-11263, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 20, page 75 Yellowstone National Park
Bridge No. 4, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 4 spans- 13'x7', 17'x6', 12'x6', 22'x6', south to north; skew 30 degrees; width 10.2'; area waterway 370 SF; Abutments: Log cribs; Intermediate Supports: 12 to 16 on logs on mud sills; Superstructures: Each span: 3 - 12 to 20 log stringers; deck of 3 plank; Condition: Abutments, fair; stringers, good; bents, fair; deck, good; Estimate: $3, 900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 4, main channel, Forney Creek, II-F-(5)-11270, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 6, over Lost Creek Great Smoky Mountains National Park Bridge No. 6, over Lost Creek; Dimensions: 1 span- 20' x 4', at right angles, width 10.5'; Abutment: 14 log sills; Superstructure: 3-14 to 16 log stringers; 3 plank deck; Condition: Abutment, veer poor; wheel guards, poor; rest of bridge, fair; Proposed: replace with steel stringers, wood deck- 1 span 10' x 4'; Estimate: $650,Bridge Maintenance Report of 1952; ELK-117, Little River Road, II-F-(5)-11182, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span - 18'x12'; skew 20 degrees; width 11'; Abutments: Cemented rough rubble: Superstructure: 4 - 8 x 4, steel I-beams; 2 - 12 to 14 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace deck and paint steel out of regular maintenance.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 1, over Indian Creek, II-F-(5)-11252, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 2, page 20 Yellowstone National Park
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11172, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 15, page 20 Yellowstone National Park
Yellowstone photo album 4a, page 20 Yellowstone National Park
Dudley Creek horse concession new trail Great Smoky Mountains National Park Start of improved horse trail in right background. Horse barn on left side of photo. This trail provides the connection to the newly-constructed trail system for the horse concession operation. Work Order No. R-20 GSM, roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Trail, II-HC-DC-14309, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite, Tractor and Crusher Great Smoky Mountains National Park ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10881, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10881, Physical Facilities - Equipment
1935-05
Yellowstone photo album 3, page 20 Yellowstone National Park
Snow removal using jeep in Cherokee Orchard road, Gatlinburg, Tennessee Great Smoky Mountains National Park In the miscellaneous areas around the shops, at Twin Creeks and Cherokee Orchard, at the Visitor Centers, and at headquarters, the jeep is invaluable because of its mobility and flexibility. Here, the snow that fell during the February 18-20 storm is being cleaned from the Cherokee Orchard road. The jeep can efficiently handle snow up to about 12 inches.Snow Removal; February 1964 Monthly Report, II-R-SR-7893, Physical Facilities - Roads - Snow Removal Operations
State working to rebuild washed out road, Cape Hatteras National Seashore, North Carolina Cape Hatteras National Seashore Same location as neg. ahead. Many travellers were marooned north of this break night of 10/20. Several cars were engulfed in rush of ponded up tide water behind barrier dune next to road; others required help to reach south. State working here.
View on map 
1958-10-22
Yellowstone photo album 20, page 85 Yellowstone National Park
Yellowstone photo album 5A, page 20 Yellowstone National Park
Yellowstone photo album 1a, page 20 Yellowstone National Park
Maps, Charleston at its defenses, 1863, New Berne, N. C., and defenses, 1864, Positions occupied by Army Corps in the Battle of Atlanta, G.A., 1864 National Park Service Map of Charleston and its defenses, Nov. 18th 1863. Map of New Berne N.C. and defenses, July 1864. Diagrams illustrating the 1st and 7th positions occupied by the 4th division, 17th Army Corps during the battle of Atlanta, G.A., July 22, 1864.
View on map 
Circa 1864

Page 50 of at least 120
About 2,500 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University