Search Results


Page 65 of at least 120
About 2,500 Items

View:
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11171, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 2, page 20 Yellowstone National Park
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11172, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 15, page 20 Yellowstone National Park
Two views of the horse barn showing dimensions, note silo, photo taken prior to restoration Structures, Exterior H.S. #17 Horse Barn And Silo (X-h. s #20 Silo). Two views of the Horse Barn showing dimensions. Also Note Silo. This photo taken prior to restoration.
View on map 
1972-06-02
Bridge No. 11, over Noland Creek Great Smoky Mountains National Park Dimensions: 2 spans- of 16'x4'; skew 20 degrees; WW 10'; area water-way 120 sq. ft. drainage area 8.5 sq. mi. Abutments: Log cribs reinforced by round timber bents resting on mud sills; Intermediate supports: Bent of 8 to 10, round timber on mud sills; Superstructure: Each span 5 to 10 log stringers, deck 4 hewed slabs; Condition: Bridge is in very poor condition; Proposed: Replace with steel stringers salvaged from other bridges, wood deck, 1 span 40'x4'; Estimate: $2, 500. Bridge Maintenance Report of 1952; FOR-155, Noland Creek Road; Bridge No. 11, over Noland Creek, II-F-(5)-11321, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 4a, page 20 Yellowstone National Park
Dudley Creek horse concession new trail Great Smoky Mountains National Park Start of improved horse trail in right background. Horse barn on left side of photo. This trail provides the connection to the newly-constructed trail system for the horse concession operation. Work Order No. R-20 GSM, roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Trail, II-HC-DC-14309, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
New drainage at Dudley Creek horse concession parking area Great Smoky Mountains National Park Improved drainage along parking area, and channel extended beyond entrance road to junction with Dudley Creek. Work Order No. R-20 GSM; roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Parking Area, II-HC-DC-14308, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite, Tractor and Crusher Great Smoky Mountains National Park ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10881, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10881, Physical Facilities - Equipment
1935-05
Yellowstone photo album 3, page 20 Yellowstone National Park
State working to rebuild washed out road, Cape Hatteras National Seashore, North Carolina Cape Hatteras National Seashore Same location as neg. ahead. Many travellers were marooned north of this break night of 10/20. Several cars were engulfed in rush of ponded up tide water behind barrier dune next to road; others required help to reach south. State working here.
View on map 
1958-10-22
Yellowstone photo album 20, page 85 Yellowstone National Park
Yellowstone photo album 5A, page 20 Yellowstone National Park
Silo shown before vegetation was removed as part of restoration process, also note that portions of main barn, horse barn, and cow shed are shown Structures, Exterior (HS 20) Silo. Silo shown before vegetation was removed as part of restoration process. Also note that portions of Main Barn, Horse Barn, and Cow Shed are shown. Barn.
View on map 
1971-11-03
Yellowstone photo album 1a, page 20 Yellowstone National Park
Maps, Charleston at its defenses, 1863, New Berne, N. C., and defenses, 1864, Positions occupied by Army Corps in the Battle of Atlanta, G.A., 1864 National Park Service Map of Charleston and its defenses, Nov. 18th 1863. Map of New Berne N.C. and defenses, July 1864. Diagrams illustrating the 1st and 7th positions occupied by the 4th division, 17th Army Corps during the battle of Atlanta, G.A., July 22, 1864.
View on map 
Circa 1864
Yellowstone photo album 24, page 20 Yellowstone National Park

Page 65 of at least 120
About 2,500 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University