Bridge No. 11, over Noland CreekGreat Smoky Mountains National ParkDimensions: 2 spans- of 16'x4'; skew 20 degrees; WW 10'; area water-way 120 sq. ft. drainage area 8.5 sq. mi. Abutments: Log cribs reinforced by round timber bents resting on mud sills; Intermediate supports: Bent of 8 to 10, round timber on mud sills; Superstructure: Each span 5 to 10 log stringers, deck 4 hewed slabs; Condition: Bridge is in very poor condition; Proposed: Replace with steel stringers salvaged from other bridges, wood deck, 1 span 40'x4'; Estimate: $2, 500. Bridge Maintenance Report of 1952; FOR-155, Noland Creek Road; Bridge No. 11, over Noland Creek, II-F-(5)-11321, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Dudley Creek horse concession new trailGreat Smoky Mountains National ParkStart of improved horse trail in right background. Horse barn on left side of photo. This trail provides the connection to the newly-constructed trail system for the horse concession operation. Work Order No. R-20 GSM, roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Trail, II-HC-DC-14309, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite, Tractor and CrusherGreat Smoky Mountains National ParkECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10881, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10881, Physical Facilities - Equipment
Snow removal using jeep in Cherokee Orchard road, Gatlinburg, TennesseeGreat Smoky Mountains National ParkIn the miscellaneous areas around the shops, at Twin Creeks and Cherokee Orchard, at the Visitor Centers, and at headquarters, the jeep is invaluable because of its mobility and flexibility. Here, the snow that fell during the February 18-20 storm is being cleaned from the Cherokee Orchard road. The jeep can efficiently handle snow up to about 12 inches.Snow Removal; February 1964 Monthly Report, II-R-SR-7894, Physical Facilities - Roads - Snow Removal Operations
State working to rebuild washed out road, Cape Hatteras National Seashore, North CarolinaCape Hatteras National SeashoreSame location as neg. ahead. Many travellers were marooned north of this break night of 10/20. Several cars were engulfed in rush of ponded up tide water behind barrier dune next to road; others required help to reach south. State working here.