Search Results


Page 22 of at least 35
About 1,700 Items

View:
Rivers Bridge State Historic Site, South Carolina South Carolina Department of Parks, Recreation and Tourism RB-20; Rivers Bridge Memorial State Park; Jim Hiers, Dr. Hartzog, Joe Folk; May 9, 1958; CWJ
View on map 
1958-05-09
Frank Hyatt, Porter Stephenson, William L Huskey Great Smoky Mountains National Park Frank Hyatt, 10 year pin. Porter Stephenson, Special Achievement award and $150. William L. Huskey, 20 year pin.Awards, IV-P-16029, Miscellaneous - Personnel
View on map 
1974-04
Person seated on airboat surrounded by slough and sawgrass, Shark River Loop Area, January 20 1969 Everglades National Park; National Park Service Person seated on airboat surrounded by slough and sawgrass; "Airboats on Shark River Loop Area; Equipment". Polyester Copy Negative.
View on map 
1969-01-20
Wager House room 1 Harpers Ferry National Historical Park Wager House Rm. #1. Note markings of earlier stair to basmen. Original caption: NHF 132, Wager House, Room 1, Note Markings of Earlier Stair to Basement That Was Revealed by Removing Later Plaster Coat, 12/20/56.
View on map 
1956-12-20
Rose Hill Plantation State Historic Site, South Carolina South Carolina Department of Parks, Recreation and Tourism Gist Cemetery; Rose Hill Plantation; Return to: S.C. State Parks 1205 Pendleton Street Columbia, S.C. 29201; Mar70A6; 20
Rose Hill Plantation State Historic Site, South Carolina South Carolina Department of Parks, Recreation and Tourism RH-17; Rose Hill; Programs & Events; Forestry Commission Negative; Dedication of Rose Hill; Dec. 20 1960; CFB.""
View on map 
1960-12-20
Special achievement award, to Hyatt, from Superintend John Cook Great Smoky Mountains National Park Supt. John Cook presents Hyatt, South District Facility Manager, a 20 year length-of-service pin.Hyatt, Frank, IV-P-16962, Miscellaneous - Personnel
View on map 
1984-03-20
Park employees on swamp buggy pulling trailer through slough, September 20 1965 Everglades National Park; National Park Service Close up view of park employees on swamp buggy pulling trailer through slough; "Tiokol 'Imp' pulling loaded trailer"; "Film: Royal Pan (ASA 400); Equipment". Polyester Copy Negative.
View on map 
1965-09-20
Greenbrier Bridge, 4th bridge over Left Fork Great Smoky Mountains National Park Partially completed...Length 162 ft. railing 200 ft. center span 40 ft. 20 ft. high,Greenbrier Bridge; 4th bridge over Left Fork, II-F-(4)-11140, Physical Facilities - Footlogs and Bridges - Bridges on Roads
View on map 
1934-05
Lengths of Service Emblems presented to multiple employees Great Smoky Mountains National Park Length of Service Emblems were presented at Staff Meeting on August 19, 1975 to Dick Moeller (20 years); George West (10 years); Vernon Lollis (10 years); George Carr (10 years).Length of Service Emblems, IV-P-4667, Miscellaneous - Personnel
1975-08-18
Aerial view, shade structure surroundings, after storm, Coquina Beach, North Carolina, 1962 Cape Hatteras National Seashore Coquina Beach shade structure surroundings after storm of March 7, 1962 view looking west #11 Neg. 20 3/9/62 Yes Cape Hatteras NSRA. Coquina Beach shade structure & surroundings after storm of 62.
View on map 
1962-03
Cannons in display in the left face interior, Fort Sumter, South Carolina National Park Service 1/20; FS-415; S/FS gv-i; Left Face interior; 4d.
Bridge No. 4, over Twentymile Creek Great Smoky Mountains National Park Dimensions: 3 spans- 15'x5.5', 17'x5.5', 24'x5.5'; skew: bridge 20 degrees, stream 45 degrees; width 12'; Abutments: South - 36 log sill; North - log bent; Intermediate Support: Log bent piers; Superstructure: 5 - 10 to 14 log stringers, 3 plank deck; Condition: Deck good; rest fair; Proposed: Replace with steel stringers, wood deck, 1 span 40'x6'; Estimate: $2, 000.Bridge Maintenance Report of 1952; TWE-165, Twentymile Creek Road; Bridge No. 4, over Twentymile Creek, II-F-(5)-11330, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Tide pools, Cape Hatteras National Seashore, North Carolina Cape Hatteras National Seashore Tidal pond among the dunes of the barrier ridge. These ponds when adjacent to the road seep water onto it often for many days following periods of heavy storm tides such as NE of 10/19-20.
View on map 
1958-10-26
Rose Hill Plantation State Historic Site, South Carolina South Carolina Department of Parks, Recreation and Tourism RH-77; Collections; For. Comm. Neg.; Display on Confederate arms and uniforms displayed at the dedication of Rose Hill Dec. 20 1960; CFB""
View on map 
1960-12-20
King's Mountain State Park, South Carolina South Carolina Department of Parks, Recreation and Tourism Kings Mountain State Park Boys Group, Man standing in front of group. July 13, 1938 E. L. Green SCFS Press Graphic -- Highly Sensitive KM-20
View on map 
1938-07-13
Yellowstone photo album 20, page 28 Yellowstone National Park
Orders from Gillmore to Major Brooks, November 20 1863 National Park Service Orders from General Gillmore to Brooks, telling Brooks to proceed to Washington City as bearer of dispatches to the General-in-Chief, and that the Steamer Delaware is at Brooks' disposal.
Bridge No. 4, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 4 spans- 13'x7', 17'x6', 12'x6', 22'x6', south to north; skew 30 degrees; width 10.2'; area waterway 370 SF; Abutments: Log cribs; Intermediate Supports: 12 to 16 on logs on mud sills; Superstructures: Each span: 3 - 12 to 20 log stringers; deck of 3 plank; Condition: Abutments, fair; stringers, good; bents, fair; deck, good; Estimate: $3, 900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 4, main channel, Forney Creek, II-F-(5)-11269, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 4, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 4 spans- 13'x7', 17'x6', 12'x6', 22'x6', south to north; skew 30 degrees; width 10.2'; area waterway 370 SF; Abutments: Log cribs; Intermediate Supports: 12 to 16 on logs on mud sills; Superstructures: Each span: 3 - 12 to 20 log stringers; deck of 3 plank; Condition: Abutments, fair; stringers, good; bents, fair; deck, good; Estimate: $3, 900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 4, main channel, Forney Creek, II-F-(5)-11270, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 6, over Lost Creek Great Smoky Mountains National Park Bridge No. 6, over Lost Creek; Dimensions: 1 span- 20' x 4', at right angles, width 10.5'; Abutment: 14 log sills; Superstructure: 3-14 to 16 log stringers; 3 plank deck; Condition: Abutment, veer poor; wheel guards, poor; rest of bridge, fair; Proposed: replace with steel stringers, wood deck- 1 span 10' x 4'; Estimate: $650,Bridge Maintenance Report of 1952; ELK-117, Little River Road, II-F-(5)-11182, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 20, page 46 Yellowstone National Park
Bridge No. 1, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span - 18'x12'; skew 20 degrees; width 11'; Abutments: Cemented rough rubble: Superstructure: 4 - 8 x 4, steel I-beams; 2 - 12 to 14 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace deck and paint steel out of regular maintenance.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 1, over Indian Creek, II-F-(5)-11252, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11171, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11172, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Dudley Creek horse concession bridge Great Smoky Mountains National Park Bridge over Dudley Creek on entrance road to the horse concession area. Work Order No. R-20 GSM: roads, parking area and trails for horse concession, Dudley Creek: Completion report photo. Dudley Creek Horse Concession Bridge, II-HC-DC-14306, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-10
Bridge No. 4, over Indian Flats Prong Great Smoky Mountains National Park Bridge No. 4, over Indian Flats Prong; Dimensions: 3 spans- 21' x 12.5' 21' x 12.5', 20' x 12.5'; width 10.3'; Abutments: log sill on HPRE; Intermediate Support: Rock-filled log crib: Superstructure: 4-14 to 16 log stringers; 3 plank deck; Condition: As a whole, bridge in poor condition; Proposed: Replace with steel stringers, wood deck, 1 span 22' x 12'; Estimate $1, 100,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11176, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 4a, page 20 Yellowstone National Park
Yellowstone photo album 11, page 20 Yellowstone National Park
Yellowstone photo album 30, page 20 Yellowstone National Park
Dudley Creek horse concession new trail Great Smoky Mountains National Park Start of improved horse trail in right background. Horse barn on left side of photo. This trail provides the connection to the newly-constructed trail system for the horse concession operation. Work Order No. R-20 GSM, roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Trail, II-HC-DC-14309, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
Hindquarters of nubian doe, Cathy, on cement milking stand Carl Sandburg Home National Historic Site Hindquarters of nubian doe, cathy. On cement milking stand with head, not shown, in white wooden stanchion in main goat barn. Leg of another goat is visible. Nine copies, carl 13720-13728. Negative carl 13729. In pencil on reverse, "20 prints this size." The 20 is written over 15.
New drainage at Dudley Creek horse concession parking area Great Smoky Mountains National Park Improved drainage along parking area, and channel extended beyond entrance road to junction with Dudley Creek. Work Order No. R-20 GSM; roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Parking Area, II-HC-DC-14308, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
Tractor and crusher working on road from North Carolina Temp. 284 to Cataloochee campsite, Tractor and Crusher Great Smoky Mountains National Park ECW. Tractor and crusher working on road from North Carolina Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10882, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from North Carolina Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10882, Physical Facilities - Equipment
1935-05
Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite, Tractor and Crusher Great Smoky Mountains National Park ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10881, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10881, Physical Facilities - Equipment
1935-05
Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite, Tractor and Crusher Great Smoky Mountains National Park ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10881, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10881, Physical Facilities - Equipment
1935-05
Yellowstone photo album 3, page 20 Yellowstone National Park
State working to rebuild washed out road, Cape Hatteras National Seashore, North Carolina Cape Hatteras National Seashore Same location as neg. ahead. Many travellers were marooned north of this break night of 10/20. Several cars were engulfed in rush of ponded up tide water behind barrier dune next to road; others required help to reach south. State working here.
View on map 
1958-10-22
Yellowstone photo album 6, page 20 Yellowstone National Park
Yellowstone photo album 5A, page 20 Yellowstone National Park
Yellowstone photo album 1a, page 20 Yellowstone National Park

Page 22 of at least 35
About 1,700 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University