Search Results


Page 57 of at least 120
About 2,500 Items

View:
Yellowstone photo album 20, page 75 Yellowstone National Park
Bridge No. 4, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 4 spans- 13'x7', 17'x6', 12'x6', 22'x6', south to north; skew 30 degrees; width 10.2'; area waterway 370 SF; Abutments: Log cribs; Intermediate Supports: 12 to 16 on logs on mud sills; Superstructures: Each span: 3 - 12 to 20 log stringers; deck of 3 plank; Condition: Abutments, fair; stringers, good; bents, fair; deck, good; Estimate: $3, 900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 4, main channel, Forney Creek, II-F-(5)-11270, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 6, over Lost Creek Great Smoky Mountains National Park Bridge No. 6, over Lost Creek; Dimensions: 1 span- 20' x 4', at right angles, width 10.5'; Abutment: 14 log sills; Superstructure: 3-14 to 16 log stringers; 3 plank deck; Condition: Abutment, veer poor; wheel guards, poor; rest of bridge, fair; Proposed: replace with steel stringers, wood deck- 1 span 10' x 4'; Estimate: $650,Bridge Maintenance Report of 1952; ELK-117, Little River Road, II-F-(5)-11182, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Moore Springs Branch Great Smoky Mountains National Park Dimensions: 3 span- 15 x 4.5', 18' x 4.5', 8' x 1.5'; skew, bridge none: stream, 20 degrees; Abutments: Log stills: Intermediate Support: Log bent piers: Superstructure: 5 - 10 to 14 log stringers; 3 plank deck; Condition: Deck good: rest, poor to fair; Proposed: Replace with steel stringers, wood deck, 2 spans 30'x4'; Estimate: $3, 000.Bridge Maintenance Report of 1952; TWE-165, Twentymile Creek Road; Bridge No. 2, over Moore Springs Branch, II-F-(5)-11327, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 2, page 20 Yellowstone National Park
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11172, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 15, page 20 Yellowstone National Park
Yellowstone photo album 4a, page 20 Yellowstone National Park
Dudley Creek horse concession new trail Great Smoky Mountains National Park Start of improved horse trail in right background. Horse barn on left side of photo. This trail provides the connection to the newly-constructed trail system for the horse concession operation. Work Order No. R-20 GSM, roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Trail, II-HC-DC-14309, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
New drainage at Dudley Creek horse concession parking area Great Smoky Mountains National Park Improved drainage along parking area, and channel extended beyond entrance road to junction with Dudley Creek. Work Order No. R-20 GSM; roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Parking Area, II-HC-DC-14308, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite, Tractor and Crusher Great Smoky Mountains National Park ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10881, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10881, Physical Facilities - Equipment
1935-05
Yellowstone photo album 3, page 20 Yellowstone National Park
Snow removal using jeep in Cherokee Orchard road, Gatlinburg, Tennessee Great Smoky Mountains National Park In the miscellaneous areas around the shops, at Twin Creeks and Cherokee Orchard, at the Visitor Centers, and at headquarters, the jeep is invaluable because of its mobility and flexibility. Here, the snow that fell during the February 18-20 storm is being cleaned from the Cherokee Orchard road. The jeep can efficiently handle snow up to about 12 inches.Snow Removal; February 1964 Monthly Report, II-R-SR-7893, Physical Facilities - Roads - Snow Removal Operations
Yellowstone photo album 20, page 85 Yellowstone National Park
Yellowstone photo album 5A, page 20 Yellowstone National Park
Silo shown before vegetation was removed as part of restoration process, also note that portions of main barn, horse barn, and cow shed are shown Structures, Exterior (HS 20) Silo. Silo shown before vegetation was removed as part of restoration process. Also note that portions of Main Barn, Horse Barn, and Cow Shed are shown. Barn.
View on map 
1971-11-03
Yellowstone photo album 1a, page 20 Yellowstone National Park
Maps, Charleston at its defenses, 1863, New Berne, N. C., and defenses, 1864, Positions occupied by Army Corps in the Battle of Atlanta, G.A., 1864 National Park Service Map of Charleston and its defenses, Nov. 18th 1863. Map of New Berne N.C. and defenses, July 1864. Diagrams illustrating the 1st and 7th positions occupied by the 4th division, 17th Army Corps during the battle of Atlanta, G.A., July 22, 1864.
View on map 
Circa 1864
Yellowstone photo album 24, page 20 Yellowstone National Park

Page 57 of at least 120
About 2,500 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University