Search Results


Page 11 of at least 36
About 3,500 Items

View:
Enacting a cannon drill, Fort Moultrie, South Carolina National Park Service cannon drill heave out of battery; 8/22/76; CCS; 8d; AUG76A6 7.
Enacting a cannon drill, Fort Moultrie, South Carolina National Park Service cannon drill- begin; 8/76; 8d; SEP76A6 1.
Enacting the cannon drill, Fort Moultrie, South Carolina National Park Service cannon drill- ram; 8/15/76; SCS; 8d; AUG76A1 10.
Enacting the cannon drill- charge, Fort Moultrie, South Carolina National Park Service cannon drill- charge; 8/22/76; LH/RW; 8E; AUG 11.
Enactor holding the cannon drill prefire, Fort Moultrie, South Carolina National Park Service cannon drill- prefire; 8/29/76; CCS; 8d; SEP76A6 15.
Enactors having a break, Fort Moultrie, South Carolina National Park Service Rev War Camp; VIP orientation day at FM 2-22-75; 8b; 1975; FEB75A6 4.
Enactors ready for drill, Fort Moultrie, South Carolina National Park Service SE/6-28-76; 2nd S.C. Continental Line; 16a; JUL 11.
Engine house site, B and O, Harpers Ferry National Historical Park Harpers Ferry National Historical Park Engine House Site B&O, no negative furnished, Credit Line requested. Original caption: U.S. Armory Sign, April 9, 1956, Dave Cruise 309-56, Photo by Conservation Commission of West Va, Credit Lines -, Engine House Site Towards B&O, U.S. Army Sign , April 9, 1956, NHF-691.
Engineering drawing of Fort Moultrie, South Carolina National Park Service 7a; FM; MAY74A5 16.
Enrollees from np-4 planting locust Mammoth Cave National Park; National Park Service
View on map 
1937-04-21
View on map 
Circa 1935
Entrance board to the fort, Fort Moultrie, South Carolina National Park Service Grounds; 18 April 1993.
Entrance to 1870s gunpowder magazine, Fort Moultrie, South Carolina National Park Service FOMO 1870 powder magazine; 3K; OCT 15.
Entrance to central bombproof, Fort Moultrie, South Carolina National Park Service Ft. Moultrie E. entrance to central bombproof (10-20-66); FM-780; 20; 3h; 15.
Entrance to central bombproof, Fort Moultrie, South Carolina National Park Service E. entrance to central bombproof; 8-15-67; FM-660; 3h.
Entrance to gunpowder magazine, Fort Moultrie, South Carolina National Park Service Entrance to magazine; July 1965; FM-195; 3K.
Entrance to small arms magazine in Fort Sumter, South Carolina National Park Service 000.56.01; FS-175; ca. 1950; S/FS,o.i; FS Entrance to Small arms magazine; 4e.
Erosion control after installation of check dams Mammoth Cave National Park; National Park Service
View on map 
Circa 1934
Erosion control work at ky np-3 gully no 2 tract no. 124 Mammoth Cave National Park; National Park Service
View on map 
Circa 1934
Erosion work complete, showing wire check dams Mammoth Cave National Park; National Park Service
View on map 
Circa 1935
Excavating the left parade of the Fort, Fort Sumter, South Carolina National Park Service FS-645; 1959; Arch/FS; right face; 59; 10; FS excavating left parade; H; l.j..
Excavating the parade, Battery Huger in the picture, Fort Sumter, South Carolina National Park Service FS-645; Arch/FS; 11; 9; Excavating Parade; l.j.; 000.922.43.
Excavation along foundation wall on public walk Harpers Ferry National Historical Park Excavation along foundation Wall on public walk (exploratory). Public Walk. Exploratory, Drainage. Original caption: NHF 159, Excavation Along Doundation Wall Public Walk Exploatory - Drainage, 4/26/57.
View on map 
1957-04-26
Excavation in the left parade and view of left face of the Fort, Fort Sumter, South Carolina National Park Service FS-645; left pace; Arch/FS; 7; l.j.; Excavating Left Parade.
Excavation of Parade and left flank, Fort Sumter, South Carolina National Park Service 2/55; FS-645; Ft. Sumter; Arch/FS; 4; 8; l.j.; Excavating Parade and Left Flank.
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation on the right face of the Fort from the Left face, Fort Sumter, South Carolina National Park Service FS-325; right face from left; Arch/FS; 8; Excavating Right Face; l.j..
Excavation work at the left face in the interior of the Fort, Fort Sumter, South Carolina National Park Service FS-405; Arch/FS; 3; 9; l.j.; 000.9464.5; 000.922.43.
Excavation work in Fort Moultrie, South Carolina National Park Service FOMO; 9; AUG75A5 7.
Excavation work of left flank and Parade, Fort Sumter, South Carolina National Park Service FS-405; Arch/FS; 11; l.j.; Excavating Left Flank and Parade; 2/59.
Exploratory Ditch at base of Garden Retaining Wall Harpers Ferry National Historical Park Exploratory Ditch at base of Garden Retaining Wall, along Public Way. Original caption: NHF 152, Exploratory Ditch at Base of Garden Retaining Wall, Along Public Way, 3/18/59.
View on map 
1957-03-18
Extended view of Fort, Fort Moultrie, South Carolina National Park Service FOMO 6/19; 3i; JUL76 7.
Extended view of north face exterior, artillery and shells in left foreground, Fort Moultrie, South Carolina National Park Service Extended view of north face exterior; May 1969 FM-80; 3f; 29.
Extended view of the Fort, Fort Moultrie, South Carolina National Park Service FOMO Restoration; 3i; APR76-04.
Extended view of the Fort, Fort Moultrie, South Carolina National Park Service FOMO 6/19; 3i; JUL 6.
Family garage during the sanding in preparation for repainting, sanding, minor repairs, and false floor Structures, Exterior (H.S. #2) Family Garage X-Maintenance Activities. Family Garage during the sanding in preparation for repainting- sanding, minor repairs, and false floor.
Family garage during the sanding in preparation for repainting, sanding, minor repairs, and false floor Structures, Exterior (H.S. #2) Family Garage X-Maintenance Activities. Family Garage during the sanding in preparation for repainting- sanding, minor repairs, and false floor.
Family garage during the sanding in preparation for repainting, sanding, minor repairs, and false floor Structures, Exterior (H.S. #2) Family Garage X-Maintenance Activities. Family Garage during the sanding in preparation for repainting- sanding, minor repairs, and false floor.
Family garage, two right hand doors open Structures, Exterior (HS) Family Garage. Family Garage, two right hand doors open.
View on map 
1969-09
Farm Manager's wood shed Structures, Exterior (HS 30) Wood Shed. Farm Manager's Wood Shed.
View on map 
1969-09
Farm Manager's wood shed prior to restoration Structures, Exterior (H.S. #30), Wood Shed (Farm Manager's). Farm Manager's Wood Shed prior to restoration.
Farm Manager's wood shed prior to restoration Structures, Exterior (H.S. #30), Wood Shed (Farm Manager's). Farm Manager's Wood Shed prior to restoration.
Farm Manager's wood shed, two views, one showing exterior measurements Structures, Exterior, Farm Manager's Woodshed (H.S. #30). Farm Manager's Wood Shed 2 views - one showing exterior measurments.
View on map 
1972-06-02
Farm Managers house, rear entrance Structures, Exterior, Farm Manager's House (H.S. #11). Farm Managers House, [rear entrance].
View on map 
1972-06-02

Page 11 of at least 36
About 3,500 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University