Search Results


Page 18 of at least 20
About 1,900 Items

View:
Three views to show opening under the house Structures, Exterior, Swedish House (H.S. #3). Three views to show opening under the house.
View on map 
1977-06
Three views to show opening under the house Structures, Exterior, Swedish House (H.S. #3). Three views to show opening under the house.
View on map 
1977-06
Tannehill residence, Elliott Key, March 1978 Biscayne National Park; National Park Service Tannehill residence.
View on map 
1978-03
Bird's Eye View of Beauregard House and River Jean Lafitte National Historical Park and Preserve
View on map 
1978-08-04
Bird's Eye View of Beauregard House and Monument Jean Lafitte National Historical Park and Preserve
View on map 
1978-08-04
Restoration of the roof of the Farm Manager's house, note crew and roof materials Structures: Exterior; (H.S. #11), Farm Manger's House. Restoration of the roof of the Farm Manager's House - Note crew and roof materials.
View on map 
1978-11
Two views of the restoration of the roof of the Fam Manager's house Structures: Exterior; (H.S. #11), Farm Manger's House. Two views of the restoration of the roof of the Fam Manager's House.
View on map 
1978-11
Restoration of the roof of the Farm Manager's house, note leaves in the gutter Structures: Exterior; (H.S. #11), Farm Manger's House. Restoration of the roof of the Farm Manager's House - Note leaves in the gutter.
View on map 
1978-11
Two views of the restoration of the side and back of the roof of the Farm Manager's house Structures: Exterior; (H.S. #11), Farm Manger's House. Two views of the restoration of the side and back of the roof of the Farm Manager's House.
View on map 
1978-11
Four views of the restoration of the roof of the Farm Manager's house Structures: Exterior; (H.S. #11), Farm Manger's House. Four (4) views of the restoration of the roof of the Farm Manager's House.
View on map 
1978-11
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Beauregard House Jean Lafitte National Historical Park and Preserve
Beauregard House Jean Lafitte National Historical Park and Preserve
Beauregard House porch Jean Lafitte National Historical Park and Preserve
View on map 
1979-01
Side of Beauregard House porch Jean Lafitte National Historical Park and Preserve
View on map 
1979-01
Interior of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-01
Side of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-01
Front porch of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-01
Side of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-01
Door of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-01
Drainage pipe on Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Side of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Front of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Pre-renovation Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Man walking to Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House building project Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Side of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House and Chalmette monument Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Chalmette battlefield and Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Front of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House across river Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Porch of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House construction project Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Side of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House and Chalmette monument Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Holes drilled in Beauregard House porch wall Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Small stairway on exterior of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House across Mississippi River Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
New wooden door on Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Stairway on exterior of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Chalmette battlefield and Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Column supporting roof of porch on Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Beauregard House across Mississippi River Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Side of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-04
Stairs to second story porch of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-05
Base of Beauregard House wall Jean Lafitte National Historical Park and Preserve
View on map 
1979-05
Walkway from the Main House to the Swedish House during the stabilization of the foundation of the Main House, note-pipe is the kind used in replacing pipes Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Walkway from the Main House to the Swedish House during the stabilization of the foundation of the Main House note-pipe is the kind used in replacing pipes.
View on map 
1979-08
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Preparation of the foundation of the Main House on the west side for stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preparation of the foundation of the Main House on the west side for stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacing drainpipes, and filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacining drainpipes, and filling with gravel and dirt.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Installation of drainpipe during the stabilization of foundation of Main House in back of house Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Installation of drainpipe during the stabilization of foundation of Main House in back of house.
View on map 
1979-08
Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Preparation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Alexander Carlone, mason, preparing to repoint stone and brick-work during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities X- Biography-Park Personnel. Alexander Carlone, mason, preparing to repoint stone and brick-work during the stabilization of the foundation of the Main House.
View on map 
1979-08
View of installation of drainpipe during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of installation of drainpipe during the stabilization of the foundation of the Main House.
View on map 
1979-08
Installation of drainpipe during the stabilization of foundation of Main House in back of house Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Installation of drainpipe during the stabilization of foundation of Main House in back of house.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Section of the Main House exposed during the stabilization of the foundation Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the Main House exposed during the stabilization of the foundation.
View on map 
1979-08
Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Yanna Fishman, laborer, working in the excavation of the foundation of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities X- Biography-Park Personnel. Yanna Fishman, laborer, working in the excavation of the foundation of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Photo taken during the stabilization of the Main House- excavation, examination, repointing stone, painting brick, replacing drainpipes, filling in with the gravel and filling with dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo taken during the stabilization of the Main House- excavation, examination, repointing stone, painting brick, replacing drainpipes, filling in with the gravel and filling with dirt.
View on map 
1979-08
Section of pipe being used in the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe being used in the stabilization of the foundation of the Main House.
View on map 
1979-08
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Replacing drainpipes and filling in during the stabilization of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Replacing drainpipes and filling in during the stabilization of the Main House.
View on map 
1979-08
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-09
Door of Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1979-09

Page 18 of at least 20
About 1,900 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University