Search Results


Page 1 of 1
85 Items

View:
View on map 
1939-03-10
Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House.
View on map 
1977-04
Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House.
View on map 
1977-04
Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House.
View on map 
1977-04
Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House.
View on map 
1977-04
Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House.
View on map 
1976-11-22
Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House.
View on map 
1976-11-22
Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House.
View on map 
1976-11-22
Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House.
View on map 
1976-11-22
Photo of broken foundation before reconstruction Structures, Exterior, Swedish House (H.S. #3). Photo of broken foundation before reconstruction.
View on map 
1977-06
Preparation of the foundation during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation during restoration.
View on map 
1977-04
Preparation of the foundation during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation during restoration.
View on map 
1977-04
Foundation of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House during restoration.
View on map 
1976-11-22
Foundation of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House during restoration.
View on map 
1977-04
Foundation of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House during restoration.
View on map 
1977-04
View of foundation of tenant house before restoration Structures, Exterior, (H.S. #4) ,Tenant House. View of foundation of tenant house before restoration.
View on map 
1975-05
View of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. View of foundation of tenant house during restoration.
View on map 
1975-05
Foundation of the Swedish House during restoration- note underpinning Structures, Exterior, Swedish House (H.S. #3). Foundation of the Swedish House during restoration- note underpinning.
View on map 
1977-04
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
View of foundation work for tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. View of foundation work for tenant house during restoration.
View on map 
1975-05
View of foundation work for tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. View of foundation work for tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Four Views of the foundation of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Four Views of the foundation of the Swedish House during restoration.
View on map 
1976-12
Four Views of the foundation of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Four Views of the foundation of the Swedish House during restoration.
View on map 
1976-12
Four Views of the foundation of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Four Views of the foundation of the Swedish House during restoration.
View on map 
1976-12
Four Views of the foundation of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Four Views of the foundation of the Swedish House during restoration.
View on map 
1976-12
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Three views of the foundation of the Swedish House during restoration- corner reinforcement Structures, Exterior, Swedish House (H.S. #3). Three views of the foundation of the Swedish House during restoration- corner reinforcement.
View on map 
1977-04
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Three views of the foundation of the Swedish House during restoration- corner reinforcement Structures, Exterior, Swedish House (H.S. #3). Three views of the foundation of the Swedish House during restoration- corner reinforcement.
View on map 
1977-04
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Three views of the foundation of the Swedish House during restoration- corner reinforcement Structures, Exterior, Swedish House (H.S. #3). Three views of the foundation of the Swedish House during restoration- corner reinforcement.
View on map 
1977-04
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Preparation of the foundation of the chimney of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation of the chimney of the Swedish House during restoration.
View on map 
1977-04
Preparation of the foundation of the chimney of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation of the chimney of the Swedish House during restoration.
View on map 
1977-04
Glenn Barnwell and one of the men working on the foundation of Swedish House Structures, Exterior, Swedish House (H.S. #3). Glenn Barnwell and one of the men working on the foundation of swedish house.
View on map 
1977-04
Section of the Main House exposed during the stabilization of the foundation Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the Main House exposed during the stabilization of the foundation.
View on map 
1979-08
Replacing drainpipes and filling in during the stabilization of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Replacing drainpipes and filling in during the stabilization of the Main House.
View on map 
1979-08
Photo of Charles Hamm and Alexander Carlone working on the Foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Photo of Charles Hamm and Alexander Carlone working on the Foundation of the Swedish House.
View on map 
1977-04
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Work being done during the restoration of the foundation of side porch and house greenhouse Structures, Exterior H.S. #1, Main House. Work being done during the restoration of the foundation of side porch and house greenhouse.
Photo of Rick Hefner working on the foundation of the Swedish House during restoration Structures, Exterior H.S. #3, Swedish House X-Biography-Park-Personnel. Photo of Rick Hefner working on the foundation of the Swedish House during restoration.
View on map 
1976-12
View of installation of drainpipe during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of installation of drainpipe during the stabilization of the foundation of the Main House.
View on map 
1979-08
Installation of drainpipe during the stabilization of foundation of Main House in back of house Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Installation of drainpipe during the stabilization of foundation of Main House in back of house.
View on map 
1979-08
Installation of drainpipe during the stabilization of foundation of Main House in back of house Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Installation of drainpipe during the stabilization of foundation of Main House in back of house.
View on map 
1979-08
Section of pipe being used in the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe being used in the stabilization of the foundation of the Main House.
View on map 
1979-08
Charles Hamm, Superintendent of Building and Grounds, and some of the crew working on the foundation of the Swedish House Structures, Exterior, Swedish House (H.S. #3). Charles Hamm, Superintendent of Building and Grounds, and some of the crew working on the foundation of the Swedish House.
View on map 
1977-04
Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House.
View on map 
1979-08
Alexander Carlone, mason, preparing to repoint stone and brick-work during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities X- Biography-Park Personnel. Alexander Carlone, mason, preparing to repoint stone and brick-work during the stabilization of the foundation of the Main House.
View on map 
1979-08
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Preparation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Photo taken during the stabilization of the Main House- excavation, examination, repointing stone, painting brick, replacing drainpipes, filling in with the gravel and filling with dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo taken during the stabilization of the Main House- excavation, examination, repointing stone, painting brick, replacing drainpipes, filling in with the gravel and filling with dirt.
View on map 
1979-08
Preparation of the foundation of the Main House on the west side for stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preparation of the foundation of the Main House on the west side for stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacing drainpipes, and filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacining drainpipes, and filling with gravel and dirt.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
Yanna Fishman, laborer, working in the excavation of the foundation of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities X- Biography-Park Personnel. Yanna Fishman, laborer, working in the excavation of the foundation of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Walkway from the Main House to the Swedish House during the stabilization of the foundation of the Main House, note-pipe is the kind used in replacing pipes Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Walkway from the Main House to the Swedish House during the stabilization of the foundation of the Main House note-pipe is the kind used in replacing pipes.
View on map 
1979-08

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University