Search Results


Page 3 of 4
178 Items

View:
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Preparation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Preparation of the foundation during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation during restoration.
View on map 
1977-04
Preparation of the foundation during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation during restoration.
View on map 
1977-04
Preparation of the foundation of the Main House on the west side for stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preparation of the foundation of the Main House on the west side for stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Preparation of the foundation of the chimney of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation of the chimney of the Swedish House during restoration.
View on map 
1977-04
Preparation of the foundation of the chimney of the Swedish House during restoration Structures, Exterior, Swedish House (H.S. #3). Preparation of the foundation of the chimney of the Swedish House during restoration.
View on map 
1977-04
Repairing road at Fighting Creek Gap on Little River Road, Tennessee, 1974 Great Smoky Mountains National Park Rebuilding the road near Fighting Creek Gap as a result of a slide.Repair of Slide, II-R-Maint-17650
View on map 
1974-06
Replacing drainpipes and filling in during the stabilization of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Replacing drainpipes and filling in during the stabilization of the Main House.
View on map 
1979-08
Section of pipe being used in the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe being used in the stabilization of the foundation of the Main House.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
Section of the Main House exposed during the stabilization of the foundation Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the Main House exposed during the stabilization of the foundation.
View on map 
1979-08
Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House.
View on map 
1979-08
Shallow strata in house foundation South Carolina State Parks Written on slide: 19
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Six views of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. Six views of foundation of tenant house during restoration.
View on map 
1975-05
Soldiers barracks foundation, Fort Jefferson Dry Tortugas National Park; National Park Service Back: ACC 57
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Stone and old plaster wall in house foundation South Carolina State Parks Written on slide: 17
Stone and old plaster wall in house foundation South Carolina State Parks Written on slide: 18
Stone and wood foundations of house South Carolina State Parks Written on slide: 2
Stone foundation South Carolina State Parks Written on slide: 18
Three men working on foundation of construction, Frye Mountain Fire Tower Cabin, North Carolina Great Smoky Mountains National Park Construction: foundation.Frye Mountain Fire Tower Cabin, II-B-(1)-3126, Physical Facilities - Buildings - Administrative buildings (ranger stations and outbuildings; warden stations; fire towers; checking stations; Geological Survey gauging stations; possession cabin
Three views of the foundation of the Swedish House during restoration- corner reinforcement Structures, Exterior, Swedish House (H.S. #3). Three views of the foundation of the Swedish House during restoration- corner reinforcement.
View on map 
1977-04
Three views of the foundation of the Swedish House during restoration- corner reinforcement Structures, Exterior, Swedish House (H.S. #3). Three views of the foundation of the Swedish House during restoration- corner reinforcement.
View on map 
1977-04
Three views of the foundation of the Swedish House during restoration- corner reinforcement Structures, Exterior, Swedish House (H.S. #3). Three views of the foundation of the Swedish House during restoration- corner reinforcement.
View on map 
1977-04
Twentymile Ranger Station, Building No. 80, construction, foundation poured Great Smoky Mountains National Park II-B-(1)-1592, Physical Facilities - Buildings - Administrative buildings (ranger stations and outbuildings; warden stations; fire towers; checking stations; Geological Survey gauging stations; possession cabin,Twentymile Ranger Station; Building No. 80, Construction. Foundation poured.
1948
Underside view of house foundation and well South Carolina State Parks Written on slide: 10
View of foundation construction and stone wall Mammoth Cave National Park; National Park Service
View of foundation construction and stone wall Mammoth Cave National Park; National Park Service
View of foundation of tenant house before restoration Structures, Exterior, (H.S. #4) ,Tenant House. View of foundation of tenant house before restoration.
View on map 
1975-05
View of foundation of tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. View of foundation of tenant house during restoration.
View on map 
1975-05
View of foundation work for tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. View of foundation work for tenant house during restoration.
View on map 
1975-05
View of foundation work for tenant house during restoration Structures, Exterior, (H.S. #4) ,Tenant House. View of foundation work for tenant house during restoration.
View on map 
1975-05
View of installation of drainpipe during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of installation of drainpipe during the stabilization of the foundation of the Main House.
View on map 
1979-08
View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacing drainpipes, and filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacining drainpipes, and filling with gravel and dirt.
View on map 
1979-08
Walkway from the Main House to the Swedish House during the stabilization of the foundation of the Main House, note-pipe is the kind used in replacing pipes Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Walkway from the Main House to the Swedish House during the stabilization of the foundation of the Main House note-pipe is the kind used in replacing pipes.
View on map 
1979-08
Well in house foundation South Carolina State Parks Written on slide: 19
Wide view of boards being placed over foundation South Carolina State Parks Written on slide: 17
Wood support beams of old house with tools South Carolina State Parks Written on slide: 9
Wooden beams and boards over foundation South Carolina State Parks Written on slide: 20

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University