Search Results


Page 39 of at least 41
About 4,000 Items

View:
Photo of the oil drum under the side porch, no longer in use Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of the oil drum under the side porch- no longer in use.
View on map 
1979-08
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
Showing condition of paint and scraping work done Family Garage. Showing condition of paint and scraping work done.
View on map 
1979-08
Part of the trellis work on the side of the house prior to removal Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Part of the trellis work on the side of the house prior to removal.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Section of the trellis under the side porch prior to removal Structures, Exterior H.S. #1, Main House. Section of the trellis under the side porch prior to removal.
View on map 
1979-08
View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacing drainpipes, and filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of the stabilization of the foundation of the Main House at the southeast corner- excavation, examination, repointing stone, painting brick, replacining drainpipes, and filling with gravel and dirt.
View on map 
1979-08
John Tuten, laborer, painting the family garage Structures, Exterior (H.S. #2) Family Garage X-Biography-Park Personnel X-Maintenance Activities. John Tuten, Laborer, painting the Family Garage.
View on map 
1979-08
View of the trellis work on the side of the house prior to removal Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of the trellis work on the side of the house prior to removal.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Gate opening of trellis under the greenhouse before removal Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Gate opening of trellis under the greenhouse before removal.
View on map 
1979-08
Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
View of the growth of shrubbery, etc. around the trellis work prior to removal of trellis Structures, Exterior H.S. #1, Main House X-Gardens and Other Plantings. View of the growth of shrubbery, etc. around the trellis work prior to removal of trellis.
View on map 
1979-08
Installation of drainpipe during the stabilization of foundation of Main House in back of house Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Installation of drainpipe during the stabilization of foundation of Main House in back of house.
View on map 
1979-08
Showing condition of paint and scraping work done Family Garage. Showing condition of paint and scraping work done.
View on map 
1979-08
Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo showing a corner of the foundation of the Main House during the stabilization of the foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Preparation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation of the back of the Main House for stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Alexander Carlone, mason, preparing to repoint stone and brick-work during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities X- Biography-Park Personnel. Alexander Carlone, mason, preparing to repoint stone and brick-work during the stabilization of the foundation of the Main House.
View on map 
1979-08
Part of the trellis work under the side of the house prior to removal Structures, Exterior H.S. #1, Main House. Part of the trellis work under the side of the house prior to removal.
View on map 
1979-08
View of installation of drainpipe during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. View of installation of drainpipe during the stabilization of the foundation of the Main House.
View on map 
1979-08
Installation of drainpipe during the stabilization of foundation of Main House in back of house Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Installation of drainpipe during the stabilization of foundation of Main House in back of house.
View on map 
1979-08
John Tuten, laborer, painting the family garage Structures, Exterior (H.S. #2) Family Garage X-Biography-Park Personnel X-Maintenance Activities. John Tuten, Laborer, painting the Family Garage.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Corner of the trellis under the greenhouse before removal Structures, Exterior H.S. #1, Main House X-Maintenance Activities X- Gardens and Other Plantings. Corner of the trellis under the greenhouse before removal.
View on map 
1979-08
Section of the Main House exposed during the stabilization of the foundation Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the Main House exposed during the stabilization of the foundation.
View on map 
1979-08
Repainting the family garage after sanding, repairs and installation of false floor Structures, Exterior (H.S. #2) Family Garage X-Maintenance Activities. Repainting the Family Garage after sanding, repairs and installation of false floor.
View on map 
1979-08
Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of the foundation showing the repointing of the stone during the stabilization of the foundation of the Main House.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Yanna Fishman, laborer, working in the excavation of the foundation of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities X- Biography-Park Personnel. Yanna Fishman, laborer, working in the excavation of the foundation of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Photo taken during the stabilization of the Main House- excavation, examination, repointing stone, painting brick, replacing drainpipes, filling in with the gravel and filling with dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo taken during the stabilization of the Main House- excavation, examination, repointing stone, painting brick, replacing drainpipes, filling in with the gravel and filling with dirt.
View on map 
1979-08
Section of pipe being used in the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe being used in the stabilization of the foundation of the Main House.
View on map 
1979-08
Part of the trellis work on the side of the house prior to removal Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Part of the trellis work on the side of the house prior to removal.
View on map 
1979-08
Southeast corner of the Main House during the stabilization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Southeast corner of the Main House during the stabilitization of foundation-excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
Front of the trellis under the greenhouse prior to removal Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Front of the trellis under the greenhouse prior to removal.
View on map 
1979-08
Four views of the foundation of the Main House during the stabilization, excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt Structures, Exterior H.S. #1, Main House. Four Views of the foundation of the Main House during the stabilization excavation, examination, repointing stone, painting brick, replacing drainpipes, filling with gravel and dirt.
View on map 
1979-08
Preparation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Preperation for putting the artifact oil drum on blocks for preservation-workers are from left to right Down Ward, Charlie Hamm, Maintenance Superintendent, Doug Brittian and Ronald Boyd.
View on map 
1979-08
Replacing drainpipes and filling in during the stabilization of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Replacing drainpipes and filling in during the stabilization of the Main House.
View on map 
1979-08
Photo of the oil drum under the side porch, no longer in use Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of the oil drum under the side porch- no longer in use.
View on map 
1979-08
Repainting the family garage after sanding, repairs and installation of false floor Structures, Exterior (H.S. #2) Family Garage X-Maintenance Activities. Repainting the Family Garage after sanding, repairs and installation of false floor.
View on map 
1979-08
Corner of the trellis work under the side of the house prior to removal Structures, Exterior H.S. #1, Main House. Corner of the trellis work under the side of the house prior to removal.
View on map 
1979-08
Photo of some of the stabilization of the foundation of the Main House Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of some of the stabilization of the foundation of the Main House.
View on map 
1979-08
Front of the trellis under the greenhouse prior to removal Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Front of the trellis under the greenhouse prior to removal.
View on map 
1979-08
Photo of the oil drum under the side porch, no longer in use Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Photo of the oil drum under the side porch- no longer in use.
View on map 
1979-08
Excavation of the foundation of the Main House prior to stabilization Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Excavation of the foundation of the Main House prior to stabilization.
View on map 
1979-08
John Tuten, laborer, painting the family garage Structures, Exterior (H.S. #2) Family Garage X-Biography-Park Personnel X-Maintenance Activities. John Tuten, Laborer, painting the Family Garage.
View on map 
1979-08
Section of pipe placed in back of the Main House during the stabilization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt Structures, Exterior H.S. #1, Main House X-Maintenance Activities. Section of pipe placed in back of the Main House during the stabilitization-excavation, examination, repointing stone, painting brick, replacing drainpipes to be filled with gravel and dirt.
View on map 
1979-08
Hampton Plantation State Park Master Plan South Carolina Department of Parks, Recreation and Tourism; National Park Service
View on map 
1979-09-20
Richard Scruggs Chimney Cowpens National Battlefield Close-up of Richard Scruggs chimney, Cowpens National Battlefield, South Carolina, 1980.
Robert Scruggs Chimney Rehab Cowpens National Battlefield Robert Scruggs Chimney before rehabilitation, Cowpens National Battlefield, South Carolina, 1980.
Robert Scruggs House Restoration Cowpens National Battlefield Robert Scruggs House Restoration, Cowpens National Battlefield, South Carolina, 1980.
Richard Scruggs Chimney Cowpens National Battlefield Richard Scruggs chimney, Cowpens National Battlefield, South Carolina, 1980.
Richard Scruggs chimney under renovation Cowpens National Battlefield Richard Scruggs chimney under renovation, Cowpens National Battlefield, South Carolina, 1980.
View of the greenhouse after restoration Structures, Exterior H.S. #9, Greenhouse. View of the greenhouse after restoration.
View of the barn pump house during restoration Structures, Exterior H.S. #10, Barn Pumphouse. View of the barn pumphouse during restoration.
View of the greenhouse after restoration Structures, Exterior H.S. #9, Greenhouse. View of the greenhouse after restoration.
View of the barn pump house during restoration Structures, Exterior H.S. #10, Barn Pumphouse. View of the barn pumphouse during restoration.
Ruins of old wall Cowpens National Battlefield Ruins of a window and old wall in a cemetery in Cowpens National Battlefield, South Carolina, 1981.
Scruggs House exhibit sign Cowpens National Battlefield Sign for the Robert Scruggs House exhibit, Cowpens National Battlefield, South Carolina, 1981.
Historic Structure Report: Antram-Gray House, Roger Williams National Memorial Clemson University Libraries Call number: i29.88: an8.
Original greenhouse at Connemara, foreground grandchildren of UF Ballard overseer of Connemara during Smythe era Structures, Exterior H.S. #9, Greenhouse. Original greenhouse at Connemara Foreground grandchildren of U.F. Ballard overseer of Connemara during Smythe era.
Rehabilitating Historic Office Buildings: Two Projects Using Federal Tax Incentives Clemson University Libraries Call number: i29.104: r26.
Beauregard House Jean Lafitte National Historical Park and Preserve
View on map 
1982-01
How to Apply National Register Criteria to Post Offices Clemson University Libraries Call number: i29.76/3: 13.
Historic Structure Report: Fure's Cabin, Katmai National Park Clemson University Libraries Call number: i29.88: f97.
Robert Scruggs House Restoration Cowpens National Battlefield Workers restoring outer walls of Robert Scruggs House, Cowpens National Battlefield, South Carolina, 1984.
Historic building Cowpens National Battlefield Dilapidated ruins of an old historic building under construction in Cowpens National Battlefield, South Carolina, 1948.
Robert Scruggs House Restoration Chinking Cowpens National Battlefield Children aiding in Robert Scruggs House outer wall restoration chinking, Cowpens National Battlefield, South Carolina, 1984.
Three Views of the Main House Three Views of the Main House.
View on map 
1984-03
Barnyard cluster Structures, Exterior H.S. 13a, Barnyard Cluster. Barnyard Cluster.
View on map 
1984-03
Historic Structures Report: Crook House, San Juan Island National Historical Park Clemson University Libraries Call number: i29.88: c88.
View on map 
1984-09
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
Six Views of the Main House Six Views of the Main House.
View on map 
1984-11
HAER Checklist: 1969-1985 Clemson University Libraries Historic American Engineering Record (HAER). Call number: i29.74: h62.
Robert Scruggs House restoration Cowpens National Battlefield Close-up of Robert Scruggs House outer wall restoration, Cowpens National Battlefield, South Carolina, 1985.

Page 39 of at least 41
About 4,000 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University