Bridge No. 1, over Indian CreekGreat Smoky Mountains National ParkDimensions: 1 span - 19'x3' at right angles; width 10'; Abutments: Log stills on HPRE; Suprestructure: 5-12 to 18 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 24'x4'; Estimates: $1, 200.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 1, over Indian Creek, II-F-(5)-11254, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Noland CreekGreat Smoky Mountains National ParkDimensions: Single span- 44.3'x5'; skew 30 degrees; width 10'; waterway area 190 sq. ft. Abutments: 10 x 10 creosoted timber bents on timber mud sills; Superstructure: 3 - 21 x 8-1/4 x 46', 631b WF I-beams... At the 1/3 points, 10 transverse I-beams are framed in and these support 4 - 3x12' timber stringers; deck 3 plank; Condition: Abutment, only fair; the rest, good; Proposed: Replace timber abutments with masonry; Estimate: $500.Bridge Maintenance Report of 1952; FOR-155, Noland Creek Road; Bridge No. 1, over Noland Creek, II-F-(5)-11311, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Noland CreekGreat Smoky Mountains National ParkDimensions: Single span- 44.3'x5'; skew 30 degrees; width 10'; waterway area 190 sq. ft. Abutments: 10 x 10 creosoted timber bents on timber mud sills; Superstructure: 3 - 21 x 8-1/4 x 46', 631b WF I-beams... At the 1/3 points, 10 transverse I-beams are framed in and these support 4 - 3x12' timber stringers; deck 3 plank; Condition: Abutment, only fair; the rest, good; Proposed: Replace timber abutments with masonry; Estimate: $500.Bridge Maintenance Report of 1952; FOR-155, Noland Creek Road; Bridge No. 1, over Noland Creek, II-F-(5)-11310, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Porters CreekGreat Smoky Mountains National ParkBridge No. 1 (log), over Porters Creek; Dimensions: 5 spans- 29' x 8',17' x 7', 15' x 4', 14' x 4', 11' x 4', west to east,; width, 10'; Abutments: log bent filled with rocks; Intermediate Support: Bent No. 1, double log on mud sills; Pier No. 2, rock-filled log crib; Bents No. 3 and 4, single log on mud sills; Superstructure: 5- log stringers (10' to 16) continuous across spans 1 and 2, and across 3, 4, and 5; 3 plank deck; Condition: deck, fair; stringers, sound; bends, caps, mud sills, abutments, and wheel guards, poor; Proposed: Replace with steel stringers, wood deck, 3 spans 32' x 6'; Estimate $5, 000,Bridge Maintenance Report of 1952; GRE-129, Ramsey Prong Road, II-F-(5)-11197, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Porters CreekGreat Smoky Mountains National ParkBridge No. 1 (log), over Porters Creek; Dimensions: 5 spans- 29' x 8',17' x 7', 15' x 4', 14' x 4', 11' x 4', west to east,; width, 10'; Abutments: log bent filled with rocks; Intermediate Support: Bent No. 1, double log on mud sills; Pier No. 2, rock-filled log crib; Bents No. 3 and 4, single log on mud sills; Superstructure: 5- log stringers (10' to 16) continuous across spans 1 and 2, and across 3, 4, and 5; 3 plank deck; Condition: deck, fair; stringers, sound; bends, caps, mud sills, abutments, and wheel guards, poor; Proposed: Replace with steel stringers, wood deck, 3 spans 32' x 6'; Estimate $5, 000,Bridge Maintenance Report of 1952; GRE-129, Ramsey Prong Road, II-F-(5)-11196, Physical Facilities - Footlogs and Bridges - Bridge Maintenance