Search Results


Page 4 of at least 43
About 840 Items

View:
Bridge No. 2, over Chasteen Creek Great Smoky Mountains National Park Bridge No. 2, over Chasteen Creek; Dimension: 1 span- 18'x5' at right angles; width 14'; Abutment: log bents backed by HPRE; Superstructure: 6 - 10 to 14 log stringers; 3 plank deck with 3 plank runners; Condition: Fair, except bottom of bent post and caps, which are rotten; Proposed: Replace with steel stringers, wood deck, 1 span 26'x5'; Estimate: $1, 300.Bridge Maintenance Report of 1952; OCO-145, Bradley Fork Road, II-F-(5)-11227, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Deep Creek Great Smoky Mountains National Park Dimensions: 1 span - 42;, at right angles, 10' wide; Abutments: Log cribbing, offset with wood bents; Superstructure: 4 - 14 log stringers; 3 plank decking; Condition: Wheel guard, poor; rest of bridge, fair; Proposed: Replace with steel stringers, wood deck, 1 span 42'x6'; Estimate: $2, 100; NOTE: Bridge located in front of Ranger Station.Bridge Maintenance Report of 1952; DEP-149, Deep Creek Road; Bridge No. 2, over Deep Creek, II-F-(5)-11242, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Deep Creek Great Smoky Mountains National Park Dimensions: 1 span - 42;, at right angles, 10' wide; Abutments: Log cribbing, offset with wood bents; Superstructure: 4 - 14 log stringers; 3 plank decking; Condition: Wheel guard, poor; rest of bridge, fair; Proposed: Replace with steel stringers, wood deck, 1 span 42'x6'; Estimate: $2, 100; NOTE: Bridge located in front of Ranger Station.Bridge Maintenance Report of 1952; DEP-149, Deep Creek Road; Bridge No. 2, over Deep Creek, II-F-(5)-11243, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11240, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11238, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11239, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Bridge No. 2, over Kephart Prong; Dimensions: 4 span- 20x6, at right angles; width 9.5'; Abutments: West - 12x12; East - 24 log sill; Intermediate Support: 12x12 caps and logs on 30 log sill; Superstructure: 4 - 14 to 20 log stringers lapped to 12 depth at seals; 3 plank deck with 3 plank runners; Proposed: Replace with steel stringers, wood deck, 1 span 24'x6'; Estimate $1, 200.Bridge Maintenance Report of 1952; OCO-145, Kephart Prong Road, II-F-(5)-11237, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11241, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Lynn Camp Prong Great Smoky Mountains National Park Bridge No. 2, over Lynn Camp Prong; Dimension: 1 span- 49' x 22', at right angles; width 12.7'; Abutments: Concrete; Superstructure: 2-50' x 5' 6 1/2 steel trusses; 3 plank deck laid diagonal on 6 x 8 floor beams; Condition: Excellent, except deck, which is poor; Proposed: replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11174, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Lynn Camp Prong Great Smoky Mountains National Park Bridge No. 2, over Lynn Camp Prong; Dimension: 1 span- 49' x 22', at right angles; width 12.7'; Abutments: Concrete; Superstructure: 2-50' x 5' 6 1/2 steel trusses; 3 plank deck laid diagonal on 6 x 8 floor beams; Condition: Excellent, except deck, which is poor; Proposed: replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11173, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11172, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11171, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Moore Springs Branch Great Smoky Mountains National Park Dimensions: 1 span- 27' x 4.5'; no skew; width 13'; Abutments: 18 logs of HPRE; Superstructure: 5-12 to 14 log stringers; split log deck; 3 plank runners; Condition: Deck rotted away; rest fair; Proposed: Replace with steel stringers, wood deck, 1 span 32' x 6'; Estimate: $1, 600,Bridge Maintenance Report of 1952; TWE-166, Moore Springs Branch Road; Bridge No. 2, over Moore Springs Branch, II-F-(5)-11338, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Moore Springs Branch Great Smoky Mountains National Park Dimensions: 3 span- 15 x 4.5', 18' x 4.5', 8' x 1.5'; skew, bridge none: stream, 20 degrees; Abutments: Log stills: Intermediate Support: Log bent piers: Superstructure: 5 - 10 to 14 log stringers; 3 plank deck; Condition: Deck good: rest, poor to fair; Proposed: Replace with steel stringers, wood deck, 2 spans 30'x4'; Estimate: $3, 000.Bridge Maintenance Report of 1952; TWE-165, Twentymile Creek Road; Bridge No. 2, over Moore Springs Branch, II-F-(5)-11326, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Moore Springs Branch Great Smoky Mountains National Park Dimensions: 1 span- 27' x 4.5'; no skew; width 13'; Abutments: 18 logs of HPRE; Superstructure: 5-12 to 14 log stringers; split log deck; 3 plank runners; Condition: Deck rotted away; rest fair; Proposed: Replace with steel stringers, wood deck, 1 span 32' x 6'; Estimate: $1, 600,Bridge Maintenance Report of 1952; TWE-166, Moore Springs Branch Road; Bridge No. 2, over Moore Springs Branch, II-F-(5)-11339, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Moore Springs Branch Great Smoky Mountains National Park Dimensions: 3 span- 15 x 4.5', 18' x 4.5', 8' x 1.5'; skew, bridge none: stream, 20 degrees; Abutments: Log stills: Intermediate Support: Log bent piers: Superstructure: 5 - 10 to 14 log stringers; 3 plank deck; Condition: Deck good: rest, poor to fair; Proposed: Replace with steel stringers, wood deck, 2 spans 30'x4'; Estimate: $3, 000.Bridge Maintenance Report of 1952; TWE-165, Twentymile Creek Road; Bridge No. 2, over Moore Springs Branch, II-F-(5)-11327, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Parsons Branch Great Smoky Mountains National Park Bridge No. 2, over Parsons Branch; Dimensions: 3 spans @ 12.5' x 4'; 25' x 6'; 24' x 5', Skew-Bridge 30 degrees left, stream 45 degrees, width 11'; Abutments: 24 log sills on HPRE; Intermediate Supports: Heavy log bents; Superstructure: 5-12 to 18 log stringers, 3 plank deck; Condition: Deck good, rest fair; Proposed: Replace with steel stringers, wood deck, 2 spans 18' x 5'; Estimate: $1, 800,Bridge Maintenance Report of 1952; CAD-100, Parsons Branch Road, II-F-(5)-11151, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Parsons Branch Great Smoky Mountains National Park Bridge No. 2, over Parsons Branch; Dimensions: 3 spans @ 12.5' x 4'; 25' x 6'; 24' x 5', Skew-Bridge 30 degrees left, stream 45 degrees, width 11'; Abutments: 24 log sills on HPRE; Intermediate Supports: Heavy log bents; Superstructure: 5-12 to 18 log stringers, 3 plank deck; Condition: Deck good, rest fair; Proposed: Replace with steel stringers, wood deck, 2 spans 18' x 5'; Estimate: $1, 800,Bridge Maintenance Report of 1951; CAD-100 Parsons Branch Road, II-F-(5)-11150, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, overflow channel, Forney Creek Great Smoky Mountains National Park Dimensions: One span - 17'x6'; skew 30 degrees; width 10'; area waterway 90 SF; Abutments: Rock-filled log cribs; Superstructure: 3 - 12 to 16 log stringers; 3 deck; Condition: Washed out; Proposed: Rebuild with steel stringers, wood deck, 1 span- 18'x6'; Estimate: $900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 2, overflow channel, Forney Creek, II-F-(5)-11266, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 26, over unnamed branch Great Smoky Mountains National Park Dimensions: One span- 26'; width 10'; Abutments: Log bents backed by HPRE; Superstructure: 3 - 14 to 18" log stringers; 3" plank deck; Condition: Satisfactory: Proposed: Replace with 18" CM pipe; Estimate: $80.",Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 26, over unnamed branch, II-F-(5)-11301, Physical Facilities - Footlogs and Bridges - Bridge Maintenance

Page 4 of at least 43
About 840 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University