Search Results


Page 1 of at least 17
About 840 Items

View:
Yellowstone photo album 31, page 69 Yellowstone National Park
Yellowstone photo album 31, page 68 Yellowstone National Park
Yellowstone photo album 31, page 79 Yellowstone National Park
Yellowstone photo album 31, page 96 Yellowstone National Park
Bridge No. 1, over Oconaluftee River Great Smoky Mountains National Park Bridge No. 1, over Oconaluftee River; Dimensions: 6 spans- 12'x8', 18'x8', 15'x9', 16'x9', 19'x8', 16'x8'; skew 30 degrees left; width12'; Abutments: North - log crib; South - log sill; Intermediate Support: Pier 1, double log bent; Piers 2, 3, 4, and 5, singlelog bents; Superstructure: 8 - 4-1/8 x 4-5/8" steel rail slingers; 3" plank deck with 3" plank runners; Condition: Mud sills rotten; Pier No. 4 partly undermined; rest of bridge good; Proposed: .",Bridge Maintenance Report of 1952; OCO-145, entrance to Kephart Prong Road on 1BKe, II-F-(5)-11235, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Oconaluftee River Great Smoky Mountains National Park Bridge No. 1, over Oconaluftee River; Dimensions: 6 spans- 12'x8', 18'x8', 15'x9', 16'x9', 19'x8', 16'x8'; skew 30 degrees left; width12'; Abutments: North - log crib; South - log sill; Intermediate Support: Pier 1, double log bent; Piers 2, 3, 4, and 5, single log bents; Superstructure: 8 - 4-1/8 x 4-5/8" steel rail slingers; 3" plank deck with 3" plank runners; Condition: Mud sills rotten; pier no. 4 partly undermined; rest of bridge good; Proposed: .",Bridge Maintenance Report of 1952; OCO-145, entrance to Kephart Prong Road on 1BKe, II-F-(5)-11236, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 4, overflow channel Great Smoky Mountains National Park Bridge No. 4, overflow channel; Dimensions: 2 span- 18'x5', 13'x5'; skew 10 degrees; width 0'; Abutment: Log cribs; Intermediate Support: Log bent piers; Superstructure: 4 continuous 12 log stringers; 3 plank deck with 3 plank runner; Condition: Decking and wheel guards, poor; rest of bridge, fair; Proposed: Replace with steel stringers, wood deck, 1 span 20'x4'; Estimate: $1, 000.Bridge Maintenance Report of 1952; OCO-145, Bradley Fork Road, II-F-(5)-11230, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 4, overflow channel Great Smoky Mountains National Park Bridge No. 4, overflow channel; Dimensions: 2 span- 18'x5', 13'x5'; skew 10 degrees; width 9'; Abutment: Log cribs; Intermediate Support: Log bent piers; Superstructure: 4 continuous 12 log stringers; 3 plank deck with 3 plank runner; Condition: Decking and wheel guards, poor; rest of bridge, fair; Proposed: Replace with steel stringers, wood deck, 1 span 20'x4'; Estimate: $1, 000.Bridge Maintenance Report of 1952; OCO-145, Bradley Fork Road, II-F-(5)-11231, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 6, overflow channel Great Smoky Mountains National Park Dimensions: Single span, 25'x2.5'; skew 45 degrees; width 10'; area waterway 50 sq. ft. Abutment: Log Crib; Superstructure: ; Condition: Abutments poor; stringers sound; deck poor; rest of bridge, fair; Proposed: Replace with steel stringers, wood deck, 1 span of 26'x4'; Estimate: $1,300. Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 6, overflow channel, II-F-(5)-11273, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge over Mingus Creek Great Smoky Mountains National Park Bridge No. over Mingus Creek; Dimensions: 1 span- 16'x2'; skew 10 degrees; width 11'; Abutments: Log crib; Superstructure: 4 log stringers, 10: to 12; 3 plank deck; Condition: Bridge in fair condition; Proposed: Replace with steel stringers, wood deck, 2 span 18'x4'; Estimate: $1, 800.Bridge Maintenance Report of 1952; OCO-144, Mingus Creek Road, II-F-(5)-11219, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge over Mingus Creek Great Smoky Mountains National Park Bridge No. ?, over Mingus Creek; Dimensions: 1 span- 17'x2'; skew 30 degrees; width 10.5'; Abutment: Log sills; Superstructure: 4-10 to 12 log stringers; 3 plank deck; Condition: Wheel guards, poor; rest of bridge, fair; Proposed: Replace with steel stringers wood deck, 1 span 24'x4'; Estimate: $1, 200.Bridge Maintenance Report of 1951; OCO-144, over Mingus Creek, II-F-(5)-11221, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge over Mingus Creek Great Smoky Mountains National Park Bridge No. over Mingus Creek; Dimensions: 1 span- 16'x2'; skew 10 degrees; width 11'; Abutments: Log crib; Superstructure: 4 log stringers, 10: to 12; 3 plank deck; Condition: Bridge in fair condition; Proposed: Replace with steel stringers, wood deck, 2 span 18'x4'; Estimate: $1, 800.Bridge Maintenance Report of 1952; OCO-144, Mingus Creek Road, II-F-(5)-11220, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 6, overflow channel Great Smoky Mountains National Park Dimensions: Single span, 25'x2.5'; skew 45 degrees; width 10'; area waterway 50 sq. ft. Abutment: Log Crib; Superstructure: ; Condition: Abutments poor; stringers sound; deck poor; rest of bridge, fair; Proposed: Replace with steel stringers, wood deck, 1 span of 26'x4'; Estimate: $1,300. Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 6, overflow channel, II-F-(5)-11272, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span- 23'x4.5'; skew 10 degrees; width 10'; Abutments: 12 log stills on HPRE; Superstructure: 4 -12 to 16 log stringers; 3 plank deck; Condition: Good; Proposed: Replace with steel stringers, wood deck, 1 span 26'x6'; Estimate: $1, 300. Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 3, over Indian Creek, II-F-(5)-11256, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 5, over Indian Creek Great Smoky Mountains National Park Dimensions: 3 spans - 4'x11', 20'x11', 6'x11'; skew 10 degrees; width 11'; Abutments: 36 log still on HPRE; Intermediate Support: Massive log bents on HPRE integral with abutment; Superstructure: 4 - 12 to 16 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 40'x11'; Estimate: $2, 000.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 5, over Indian Creek, II-F-(5)-11261, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Forney Creek Road; Bridge No. 20 Great Smoky Mountains National Park Dimensions: 3 spans- 23.3'x4', 23.8'x5', 20.5'x8'; width 10.6'; skew 30 degrees; waterway area 230 sq. ft.l Abutments: Log bents backed by HPRE; Intermediate Support: Log bent; Superstructure: 3 log stringers, 12 to 16; 3 plank deck; Condition: Fair, Proposed: Replace with steel stringers, wood deck, 1 span 26'x4'; Estimate: $1, 300.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 20, II-F-(5)-11292, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 3 spans- 22'x5', 21'x5', 21'x5', 16'x5'; skew 30 degrees; width 10'; area waterway 260 sq. ft. Abutments: Rock-filled log cribs; Intermediate Supports: Double bents of 12 to 16 logs; Superstructure: Each span, 3 log stringers, 12 to 16. Deck, split logs with 3 plank runners; Condition: Abutments poor; stringers good; deck poor; bents poor; Proposed: Replace with steel stringers, wood deck, 2 spans of 30'x6'; Estimate: $3, 000.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 3, main channel, Forney Creek, II-F-(5)-11268, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Forney Creek Road; Bridge No. 11 Great Smoky Mountains National Park Dimensions: 4 spans- 20.5'x8', 27'x8', 26.8'x8', 23.7'x8'; skew 45 degrees; width of 9.4'; VC 8'; area waterway 500 sq.ft. Abutments: North abutment, log breastwall behind log bent; south abutment, HPRE behind log bent; Immediate Supports: Log bents; Superstructure: 3 log stringers, 12 to 14 each span; split log decking with plank runners; Condition: Breast behind north abutment, rotten; deck, poor; bent, dropped down causing stringer to sag; Proposed: Replace with steel stringers, wood deck, 3 span 32'x8'; Estimate: $5, 100.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 11, II-F-(5)-11282, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 5, over Indian Creek Great Smoky Mountains National Park Dimensions: 3 spans - 4'x11', 20'x11', 6'x11'; skew 10 degrees; width 11'; Abutments: 36 log still on HPRE; Intermediate Support: Massive log bents on HPRE integral with abutment; Superstructure: 4 - 12 to 16 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 40'x11'; Estimate: $2, 000.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 5, over Indian Creek, II-F-(5)-11260, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Forney Creek Road; Bridge No. 11 Great Smoky Mountains National Park Dimensions: 4 spans- 20.5'x8', 27'x8', 26.8'x8', 23.7'x8'; skew 45 degrees; width of 9.4'; VC 8'; area waterway 500 sq.ft. Abutments: North abutment, log breastwall behind log bent; south abutment, HPRE behind log bent; Immediate Supports: Log bents; Superstructure: 3 log stringers, 12 to 14 each span; split log decking with plank runners; Condition: Breast behind north abutment, rotten; deck, poor; bent, dropped down causing stringer to sag; Proposed: Replace with steel stringers, wood deck, 3 span 32'x8'; Estimate: $5, 100.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 11, II-F-(5)-11283, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 13, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 5 spans- 15.5'x8', 22.5'x5', 26.8'x5', 22.6'x5', 16.3'x5; width 10.4'; area waterway 460 sq. ft. Abutments: North abutment, mud sill only; South abutment, log bent backed by HPRE; Intermediate Supports: Log bents on mud sills; Superstructure: Each span, 3 log stringers, 12 to 14'; 3 plank decking; Condition: Washed out; Proposed: Rebuild with steel stringers, wood deck, 2 spans 26'x6'; Estimate: $2, 600.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 13, main channel, Forney Creek, II-F-(5)-11285, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 5, over Deep Creek Great Smoky Mountains National Park Dimensions: 3 spans, 18'x14', 27'x14', 8'x14', north to south; skew 15 degrees; width 9.5'; Abutment: Rock-filled log cribs; Intermediate Support: 12 x 12 timber bents; Superstructure: 4 - 12 to 18 log stringers, 3 plank deck; Condition: As a whole, bridge is fair but part of deck needs replacing; Proposed: Replace with steel stringers, wood deck, 1 span 40'x14'; Estimate: $2, 000.Bridge Maintenance Report of 1952; DEP-149, Deep Creek Road; Bridge No. 5, over Deep Creek, II-F-(5)-11249, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11238, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 14, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 2 spans- 22.5'x5.5', 24.5x5.5'; width 10'; skew 15 degrees; area waterway 25.5 sq. ft. Abutments: North abutment, log bent backed with HPRE; South abutment, log crib, rock-filled; Intermediate Support: Log bent; Superstructure: Each span, 3 log stringers 12 to 14; split log deck with plank runners; Condition: Abutments, fair; bent, good; stringers, good; deck, poor; guard rails, poor; Proposed: Replace with steel stringers, wood deck, 2 spans 22'x6'; Estimate: $2, 200.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 14, main channel, Forney Creek, II-F-(5)-11287, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 4 spans- 21'x5', 25'x5', 25'x5', 25'x5'; skew 30 degrees; width 11.7'; area waterway, 420+SF; Abutments: None. Stringers rest on log mud sills; Intermediate Supports: Log bents on mud sills; Superstructure: Each span supported by 5 - 18 to 24 log stringers; deck of 3 plank; Condition: Bents and stringers apparently sound; deck good; Proposed: Replace with steel stringers, wood deck. 3 spans- 30'x6'; Estimate: $4, 500.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 1, main channel, Forney Creek, II-F-(5)-11264, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 7, Taywa Branch Great Smoky Mountains National Park Bridge No. 7, Taywa Branch; Dimensions: 1 span 19'x6', at right angles; width 10'; Abutment: Log cribs; Superstructure: 4 - 10 to 12 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 12'x6'; Estimate: $600.Bridge Maintenance Report of 1952; OCO-145, Bradley Fork Road, II-F-(5)-11234, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 5, over Deep Creek Great Smoky Mountains National Park Dimensions: 3 spans, 18'x14', 27'x14', 8'x14', north to south; skew 15 degrees; width 9.5'; Abutment: Rock-filled log cribs; Intermediate Support: 12 x 12 timber bents; Superstructure: 4 - 12 to 18 log stringers, 3 plank deck; Condition: As a whole, bridge is fair but part of deck needs replacing; Proposed: Replace with steel stringers, wood deck, 1 span 40'x14'; Estimate: $2, 000.Bridge Maintenance Report of 1952; DEP-149, Deep Creek Road; Bridge No. 5, over Deep Creek, II-F-(5)-11248, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11241, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 14, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 2 spans- 22.5'x5.5', 24.5x5.5'; width 10'; skew 15 degrees; area waterway 25.5 sq. ft. Abutments: North abutment, log bent backed with HPRE; South abutment, log crib, rock-filled; Intermediate Support: Log bent; Superstructure: Each span, 3 log stringers 12 to 14; split log deck with plank runners; Condition: Abutments, fair; bent, good; stringers, good; deck, poor; guard rails, poor; Proposed: Replace with steel stringers, wood deck, 2 spans 22'x6'; Estimate: $2, 200.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 14, main channel, Forney Creek, II-F-(5)-11286, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge over Mingus Creek Great Smoky Mountains National Park Bridge No. over Mingus Creek; Dimension: 1 span- 17'x2'; skew 30 degrees; width 10.5'; Abutment: Log sills; Superstructure: 4 - 10 to 12 log stringers; 3 plank deck; Condition: Wheel guards, poor; rest of bridge, fair; Proposed: Replace with steel stringers wood deck, 1 span 24'x4'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-144, over Mingus Creek, II-F-(5)-11223, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span- 23'x4.5'; skew 10 degrees; width 10'; Abutments: 12 log stills on HPRE; Superstructure: 4 -12 to 16 log stringers; 3 plank deck; Condition: Good; Proposed: Replace with steel stringers, wood deck, 1 span 26'x6'; Estimate: $1, 300. Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 3, over Indian Creek, II-F-(5)-11257, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge over Mingus Creek Great Smoky Mountains National Park Bridge No. over Mingus Creek; Dimension: 1 span- 17'x2'; skew 30 degrees; width 10.5'; Abutment: Log sills; Superstructure: 4 - 10 to 12 log stringers; 3 plank deck; Condition: Wheel guards, poor; rest of bridge, fair; Proposed: Replace with steel stringers wood deck, 1 span 24'x4'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-144, over Mingus Creek, II-F-(5)-11222 , Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11240, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span - 19'x3' at right angles; width 10'; Abutments: Log stills on HPRE; Suprestructure: 5-12 to 18 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 24'x4'; Estimates: $1, 200.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 1, over Indian Creek, II-F-(5)-11255, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 5, overflow channel Great Smoky Mountains National Park Bridge No. 5 (log), overflow channel; Dimensions: 2 spans- 27' x 11', 23' x 2.5'; width 10.7', no skew; Abutment: Rock filled log cribs; Intermediate Support: 2 double log bents; Superstructure: 4 log stringers (12 to 16); 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 2 spans, 36' x 8'; Estimate: $4, 400,Bridge Maintenance Report of 1952; GRE-129, Ramsey Prong Road, II-F-(5)-11204, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 7, Taywa Branch Great Smoky Mountains National Park Bridge No. 7, Taywa Branch; Dimensions: 1 span 19'x6', at right angles; width 10'; Abutment: Log cribs; Superstructure: 4 - 10 to 12 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 12'x6'; Estimate: $600.Bridge Maintenance Report of 1952; OCO-145, Bradley Fork Road, II-F-(5)-11233, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Bradley Fork Great Smoky Mountains National Park Bridge No. 3, over Bradley Fork; Dimensions: 2 span- 10'x8', 22'x8'; skew 15 degrees; width 9.5'; Abutment: Log crib, rock-filled; Intermediate Support: Log bents; Superstructure: 4 -12 to 16 log stringers; 3 plank deck, with 3 runners; Condition: Fair, except deck, which is rotten; Proposed: Replaced with steel stringers, wood deck, 1 span 30'x8'; Estimate: $1, 500.Bridge Maintenance Report of 1952; OCO-145, Bradley Fork Road, II-F-(5)-11228, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 13, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 5 spans- 15.5'x8', 22.5'x5', 26.8'x5', 22.6'x5', 16.3'x5; width 10.4'; area waterway 460 sq. ft. Abutments: North abutment, mud sill only; South abutment, log bent backed by HPRE; Intermediate Supports: Log bents on mud sills; Superstructure: Each span, 3 log stringers, 12 to 14'; 3 plank decking; Condition: Washed out; Proposed: Rebuild with steel stringers, wood deck, 2 spans 26'x6'; Estimate: $2, 600.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 13, main channel, Forney Creek, II-F-(5)-11284, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span - 19'x3' at right angles; width 10'; Abutments: Log stills on HPRE; Suprestructure: 5-12 to 18 log stringers; 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 1 span 24'x4'; Estimates: $1, 200.Bridge Maintenance Report of 1952; DEP-150, Indian Creek Road; Bridge No. 1, over Indian Creek, II-F-(5)-11254, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 1, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 4 spans- 21'x5', 25'x5', 25'x5', 25'x5'; skew 30 degrees; width 11.7'; area waterway, 420+SF; Abutments: None. Stringers rest on log mud sills; Intermediate Supports: Log bents on mud sills; Superstructure: Each span supported by 5 - 18 to 24 log stringers; deck of 3 plank; Condition: Bents and stringers apparently sound; deck good; Proposed: Replace with steel stringers, wood deck. 3 spans- 30'x6'; Estimate: $4, 500.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 1, main channel, Forney Creek, II-F-(5)-11265, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11239, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 5, overflow channel Great Smoky Mountains National Park Bridge No. 5 (log), overflow channel; Dimensions: 2 spans- 27' x 11', 23' x 2.5'; width 10.7', no skew; Abutment: Rock filled log cribs; Intermediate Support: 2 double log bents; Superstructure: 4 log stringers (12 to 16); 3 plank deck; Condition: Fair; Proposed: Replace with steel stringers, wood deck, 2 spans, 36' x 8'; Estimate: $4, 400,Bridge Maintenance Report of 1952; GRE-129, Ramsey Prong Road, II-F-(5)-11205, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 16, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 3 spans- 25'x6', 27'x6', 23'x6'' width 10'; Abutments: North abutment is load-bearing, log breastwall; south abutment, wooden block under each stringer rests on large boulder; Immediate support: Log bents on mud sills; Superstructure: 3 log stringers 14 to 16; split log deck with 3 runners; Condition: North abutment, poor--logs need replacing; south abutment and bents, ok; stringers, rotten; deck and guard wall, poor; Proposed: Replace with steel stringers, wood deck, 2 spans 22'x6'; Estimate: $2, 200. Bridge Maintenance Report of 1951; FOR-153 Forney Creek Road; Bridge No. 16, main channel, Forney Creek, II-F-(5)-11289, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 7, overflow channel Great Smoky Mountains National Park Dimensions: 2 spans- 14'x5', 18'x5'; skew 15 degrees; width 12'; area waterway 150 sq. ft. Abutments: Log cribs; Intermediate supports: Log bent, 12 to 14 logs; Superstructure: 3 - 12 to 16 log stringers, deck of split logs with plank runners; Condition: South abutment, good; north abutment, poor; stringers, poor to fair; deck, poor; bent, fair; Proposed: Replace with steel stringers, wood deck, 1 span 30'x6'; Estimate: $1, 500.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 7, overflow channel, II-F-(5)-11274, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Bradley Fork Great Smoky Mountains National Park Bridge No. 3, over Bradley Fork; Dimensions: 2 span- 10'x8', 22'x8'; skew 15 degrees; width 9.5'; Abutment: Log crib, rock-filled; Intermediate Support: Log bents; Superstructure: 4 - 12 to 16 log stringers; 3 1/4 plank deck with 3 runners; Condition: Fair, except deck, which is rotten; Proposed: Replace with steelstringers, wood deck, 1 span 30'x8'; Estimate: $1, 500,Bridge Maintenance Report of 1952; OCO-145, Bradley Fork Road, II-F-(5)-11229, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 8, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 3 spans- 22'x5', 24.5'x5', 20'x5'; skew 25 degrees; width 10.3; area waterway 290 sq. ft. Abutments: Log sills; Intermediate Support: Log bents; Superstucture: Each span has 3 - 12 to 18 log stringers; split log decking with runners; Condition: Mud sills rotten; stringers sound; decking poor; guard rails poor; bents, poor to fair; Proposed: Replace with steel stringers, wood deck, 2 spans of 34'x6'; Estimate: $3, 400.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 8, main channel, Forney Creek, II-F-(5)-11277, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, overflow channel, Forney Creek Great Smoky Mountains National Park Dimensions: One span - 17'x6'; skew 30 degrees; width 10'; area waterway 90 SF; Abutments: Rock-filled log cribs; Superstructure: 3 - 12 to 16 log stringers; 3 deck; Condition: Washed out; Proposed: Rebuild with steel stringers, wood deck, 1 span- 18'x6'; Estimate: $900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 2, overflow channel, Forney Creek, II-F-(5)-11266, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 8, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 3 spans- 22'x5', 24.5'x5', 20'x5'; skew 25 degrees; width 10.3; area waterway 290 sq. ft. Abutments: Log sills; Intermediate Support: Log bents; Superstucture: Each span has 3 - 12 to 18 log stringers; split log decking with runners; Condition: Mud sills rotten; stringers sound; decking poor; guard rails poor; bents, poor to fair; Proposed: Replace with steel stringers, wood deck, 2 spans of 34'x6'; Estimate: $3, 400.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 8, main channel, Forney Creek, II-F-(5)-11276, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 4, over Indian Creek Great Smoky Mountains National Park Dimensions: 1 span - 29'x14'; width 10.5'; Abutments: V-type log crib; Superstructure: 4 - 12 to 16 log stringers; 3 plank deck with 3 plank runners; Condition: Fair, except upper abutment, which is poor; Proposed: Replace with steel stringers, wood deck, 1 span 30'x14'; Estimate: $1, 500.Bridge Maintenance Report of 1952; DEP-149, Deep Creek Road; Bridge No. 4, over Indian Creek, II-F-(5)-11246, Physical Facilities - Footlogs and Bridges - Bridge Maintenance

Page 1 of at least 17
About 840 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University