Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11238, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11239, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Bridge No. 2, over Kephart Prong; Dimensions: 4 span- 20x6, at right angles; width 9.5'; Abutments: West - 12x12; East - 24 log sill; Intermediate Support: 12x12 caps and logs on 30 log sill; Superstructure: 4 - 14 to 20 log stringers lapped to 12 depth at seals; 3 plank deck with 3 plank runners; Proposed: Replace with steel stringers, wood deck, 1 span 24'x6'; Estimate $1, 200.Bridge Maintenance Report of 1952; OCO-145, Kephart Prong Road, II-F-(5)-11237, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Kephart Prong Great Smoky Mountains National Park Dimensions: 5 spans - 12'x5', 16'x5', 14'x5', 11'x5'; skew 30 degrees; width 12'; Abutments: Log mud sills; Intermediate support: 4 log bent piers, sills on log grillage; superstructure: 4-12 to 16 log stringers; split log deck with 3 plank runners; Condition: deck, very poor; 1 stringer rotten; caps rotten; abutments rotten; bents, fair; Proposed: replace with steel stringers, wood deck, 1 span 24'x6'; Estimate: $1, 200.Bridge Maintenance Report of 1952; OCO-146, Kephart Prong Road; Bridge No. 2, over Kephart Prong, II-F-(5)-11241, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Lynn Camp Prong Great Smoky Mountains National Park Bridge No. 2, over Lynn Camp Prong; Dimension: 1 span- 49' x 22', at right angles; width 12.7'; Abutments: Concrete; Superstructure: 2-50' x 5' 6 1/2 steel trusses; 3 plank deck laid diagonal on 6 x 8 floor beams; Condition: Excellent, except deck, which is poor; Proposed: replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11174, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Lynn Camp Prong Great Smoky Mountains National Park Bridge No. 2, over Lynn Camp Prong; Dimension: 1 span- 49' x 22', at right angles; width 12.7'; Abutments: Concrete; Superstructure: 2-50' x 5' 6 1/2 steel trusses; 3 plank deck laid diagonal on 6 x 8 floor beams; Condition: Excellent, except deck, which is poor; Proposed: replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11173, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11172, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Middle Prong Great Smoky Mountains National Park Bridge No. 2, over Middle Prong; Dimensions: 2 span- 50' x 12', 25' x 18'; Skew 20 degrees, width 12'; Intermediate support: concrete pier; Abutments: Concrete; Superstructures: 50' span (2), 50' x 5' 6 1/2 deck truss; 25' span (2) 24 X 7 I-beams; deck 3 planks laid diagonal on 6 x 8 floor beams; Condition: excellent, except deck and wheel guard, which are poor; Proposed: Replace decking out of regular maintenance,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11171, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Parsons Branch Great Smoky Mountains National Park Bridge No. 2, over Parsons Branch; Dimensions: 3 spans @ 12.5' x 4'; 25' x 6'; 24' x 5', Skew-Bridge 30 degrees left, stream 45 degrees, width 11'; Abutments: 24 log sills on HPRE; Intermediate Supports: Heavy log bents; Superstructure: 5-12 to 18 log stringers, 3 plank deck; Condition: Deck good, rest fair; Proposed: Replace with steel stringers, wood deck, 2 spans 18' x 5'; Estimate: $1, 800,Bridge Maintenance Report of 1952; CAD-100, Parsons Branch Road, II-F-(5)-11151, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, over Parsons Branch Great Smoky Mountains National Park Bridge No. 2, over Parsons Branch; Dimensions: 3 spans @ 12.5' x 4'; 25' x 6'; 24' x 5', Skew-Bridge 30 degrees left, stream 45 degrees, width 11'; Abutments: 24 log sills on HPRE; Intermediate Supports: Heavy log bents; Superstructure: 5-12 to 18 log stringers, 3 plank deck; Condition: Deck good, rest fair; Proposed: Replace with steel stringers, wood deck, 2 spans 18' x 5'; Estimate: $1, 800,Bridge Maintenance Report of 1951; CAD-100 Parsons Branch Road, II-F-(5)-11150, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 2, overflow channel, Forney Creek Great Smoky Mountains National Park Dimensions: One span - 17'x6'; skew 30 degrees; width 10'; area waterway 90 SF; Abutments: Rock-filled log cribs; Superstructure: 3 - 12 to 16 log stringers; 3 deck; Condition: Washed out; Proposed: Rebuild with steel stringers, wood deck, 1 span- 18'x6'; Estimate: $900.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 2, overflow channel, Forney Creek, II-F-(5)-11266, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3 over Parsons Branch Great Smoky Mountains National Park Bridge No. 3 over Parsons Branch; Dimensions: 3 spans @ 11' x 3 1/2', 24' x 6', 18.5' x 3.5' , Skew 15 degrees. Abutments: 24 log stills; Intermediate Support: Log bents; Superstructure: 5-16 to 20 log stringers, 3 plank deck'; Condition: Deck good, rest fair; Proposed: Replace with steel stringers wood deck, 2 spans 18' x 5'; Estimate: $1, 800,Bridge Maintenance Report of 1952; CAD-100, Parsons Branch Road, II-F-(5)-11152, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 3 spans- 22'x5', 21'x5', 21'x5', 16'x5'; skew 30 degrees; width 10'; area waterway 260 sq. ft. Abutments: Rock-filled log cribs; Intermediate Supports: Double bents of 12 to 16 logs; Superstructure: Each span, 3 log stringers, 12 to 16. Deck, split logs with 3 plank runners; Condition: Abutments poor; stringers good; deck poor; bents poor; Proposed: Replace with steel stringers, wood deck, 2 spans of 30'x6'; Estimate: $3, 000.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 3, main channel, Forney Creek, II-F-(5)-11268, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, main channel, Forney Creek Great Smoky Mountains National Park Dimensions: 3 spans- 22'x5', 21'x4', 16;x5'; skew 30 degrees; width 10'; area waterway 260 sq. ft. Abutments: Rock-filled log cribs; Intermediate Supports: Double bents of 12 to 16 logs; Superstructure: Each span, 3 log stringers, 12 to 16. Deck, split logs with 3 plank runners. Condition: Abutments poor; stringers good; deck poor; bents poor; Proposed: Replace with steel stringers, wood deck, 2 spans of 30'x6'; Estimate: $3, 000.Bridge Maintenance Report of 1952; FOR-153, Forney Creek Road; Bridge No. 3, main channel, Forney Creek, II-F-(5)-11267, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Bradley Fork Great Smoky Mountains National Park Bridge No. 3, over Bradley Fork; Dimensions: 2 span- 10'x8', 22'x8'; skew 15 degrees; width 9.5'; Abutment: Log crib, rock-filled; Intermediate Support: Log bents; Superstructure: 4 -12 to 16 log stringers; 3 plank deck, with 3 runners; Condition: Fair, except deck, which is rotten; Proposed: Replaced with steel stringers, wood deck, 1 span 30'x8'; Estimate: $1, 500.Bridge Maintenance Report of 1952; OCO-145, Bradley Fork Road, II-F-(5)-11228, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Bradley Fork Great Smoky Mountains National Park Bridge No. 3, over Bradley Fork; Dimensions: 2 span- 10'x8', 22'x8'; skew 15 degrees; width 9.5'; Abutment: Log crib, rock-filled; Intermediate Support: Log bents; Superstructure: 4 - 12 to 16 log stringers; 3 1/4 plank deck with 3 runners; Condition: Fair, except deck, which is rotten; Proposed: Replace with steelstringers, wood deck, 1 span 30'x8'; Estimate: $1, 500,Bridge Maintenance Report of 1952; OCO-145, Bradley Fork Road, II-F-(5)-11229, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Deep Creek Great Smoky Mountains National Park Dimensions: 1 span - 37'x10'; skew 30 degrees; width 11.5'; Abutments: West - log bent backed by log crib; East - log crib on boulder; Superstructure: 4 - 10 to 14 log stringers; 3 plank deck; Condition: Abutments, rotten: stringers, fair; deck, fair; Proposed: Replace with steel stringers, wood deck, 1 span 50'x10'; Estimate: $2, 500.Bridge Maintenance Report of 1952; DEP-149, Deep Creek Road; Bridge No. 3, over Deep Creek, II-F-(5)-11245, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Deep Creek Great Smoky Mountains National Park Dimensions: 1 span - 37'x10'; skew 30 degrees; width 11.5'; Abutments: West - log bent backed by log crib; East - log crib on boulder; Superstructure: 4 - 10 to 14 log stringers; 3 plank deck; Condition: Abutments, rotten: stringers, fair; deck, fair; Proposed: Replace with steel stringers, wood deck, 1 span 50'x10'; Estimate: $2, 500.Bridge Maintenance Report of 1952; DEP-149, Deep Creek Road; Bridge No. 3, over Deep Creek, II-F-(5)-11244, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Huskey Branch Great Smoky Mountains National Park Bridge No. 3, over Huskey Branch; Dimensions: 1 span, 18.5' x 5', width 10.5', at right angles; Abutments: log crib; Superstructure: (3) 14 to 18 log stringers; 3 plank deck; Condition: Abutments, deck, guard rails, poor; stringers, sound; Proposed: Replace with steel stringer, wood deck, 1 span 16' x 4'; Estimate $1, 000,Bridge Maintenance Report of 1952; ELK-117, Little River Road, II-F-(5)-11178, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 3, over Huskey Branch Great Smoky Mountains National Park Bridge No. 3, over Huskey Branch; Dimensions: 1 span, 18.5' x 5', width 10.5', at right angles; Abutments: log crib; Superstructure: (3) 14 to 18 log stringers; 3 plank deck; Condition: Abutments, deck, guard rails, poor; stringers, sound; Proposed: Replace with steel stringer, wood deck, 1 span 16' x 4'; Estimate $1, 000,Bridge Maintenance Report of 1952; ELK-117, Little River Road, II-F-(5)-11177, Physical Facilities - Footlogs and Bridges - Bridge Maintenance