Toggle navigation
explore
parks
collections
reports and research literature
map
outreach
hosted mapping
how to participate
about
about opn
access OPN data via OAI
contact
navigating collections
using images
Search Results
Sort (date)
Relevance
Title
Date
Items per page (100):
20
50
100
Page 9 of at least 11
About 1,000 Items
Jump to Page
View:
Refine Search
update
reset
Park
Blue Ridge Parkway
307
Cape Hatteras National Seashore
48
Clemson University Libraries
1
Great Smoky Mountains National Park
42
Mammoth Cave National Park
526
National Park Service
526
Yellowstone National Park
161
Collection
Blue Ridge Parkway Engineering Plans
307
Civilian Conservation Corps in Mammoth Cave National Park
384
Mammoth Cave National Park Nitrate Negatives Collection
142
Negatives of Great Smoky Mountains National Park
42
Ocracoke Island
48
Reports and Research Literature
1
Yellowstone Photo Albums
161
Creator
AHB
6
ALA
9
ALH
1
ASB
2
Beyer
6
Blue Ridge Parkway Maps and Drawings
25
Burkett, Claire P.
1
Burns
2
CEF
1
CGS
1
CHD
2
CSG
2
Cleve, Van
1
EGF
2
EHA
4
EMB
1
EODC
11
Exline, Edouard Evartt
4
Farmer, CE
1
Fay, Frederick A.
2
Glover
1
Grossman, C S
3
HEVG
3
Henderson
1
Hope
5
JDT
2
JFR
1
Lewis
2
Malbon
1
May
2
National Park Service
1
Newcomb
2
PWV
1
RAH
4
REK
1
RES
1
Sours
4
Swope
2
Swope, H. B.
1
Vancleve
3
WAJ
2
WBC
1
WDH
3
WDL
4
WEN
2
WGC
1
WHG
4
WLD
1
WMG
1
Date
From:
January
February
March
April
May
June
July
August
September
October
November
December
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Until:
January
February
March
April
May
June
July
August
September
October
November
December
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
topic
Albright, Horace M. (Horace Marden), 1890-1987
2
Amphitheaters
3
Arches
1
Asphalt
5
Asphalt pavers
2
Asphalt rock
5
Automobiles
26
Bays
4
Bitumen
1
Blasting
1
Blue Ridge Parkway (N.C. and Va.)
307
Blueprints
1
Boats and boating
1
Boulders
1
Bridge approaches
5
Bridges
12
Bridges--Design and construction
10
Building materials
2
Buildings
3
Bulldozers
3
Camp sites, facilities, etc
17
Camping
1
Canyons
8
Carriages and carts
1
Caves
2
Cities and towns
8
Civilian Conservation Corps (U.S.)
151
Clearing of land
13
Cliffs
7
Cofferdams
1
Concrete--Mixing
1
Conservation and restoration
9
Construction
55
Construction equipment
24
Construction projects
6
Courtyards
3
Cribwork
1
Crushing machinery
3
Culverts
9
Curbs
1
Dams
1
Designs and plans
2
Dirt roads
38
Drawings
1
Driveways
6
Dump trucks
4
Dust
3
Dwellings
2
Dynamite
1
Earthmoving machinery
1
Elevated highways
8
Engineering drawings
95
Equipment
10
Erosion
16
Everts, Mount (Wyo.)
1
Explosives
3
Ferries
15
Fills (Earthwork)
11
Firehole River (Wyo.)
8
Flood damage
1
Forests
2
Forests and forestry
113
Formations (Geology)
1
Fountain Paint Pot (Wyo.)
2
Fuelwood
1
Gardner River (Wyo. and Mont.)
1
Gateways
2
George Washington National Forest (Va. and W. Va.)
1
Geysers
6
Gibbon River (Wyo.)
1
Golden Gate (Wyo.)
5
Government employees
6
Government vehicles
2
Graders (Earthmoving machinery)
13
Grading
3
Grading (Earthwork)
11
Grasses
1
Gravel
7
Gravel roads
2
Great Smoky Mountains National Park Biosphere Reserve (N.C. and Tenn.)
11
Highway relocation
1
Horse-drawn vehicles
14
Horses
8
Hot springs
6
Incinerators
1
Indiana Dunes National Lakeshore (Ind.)
1
Interstate 26
1
Jackhammers
1
Jupiter Terrace (Wyo.)
1
Lakes
6
Lampposts
2
Land tenure
4
Landscape architecture
1
Landscapes
3
Landslides
3
Lane lines (Roads)
2
Liberty Cap (Wyo.)
1
Log buildings
1
Macadam roads
1
Masonry
3
Meadows
3
Mountain passes
4
Mountain resorts
1
Mountains
107
Mud
1
Mudslides
2
Museums
2
National parks & reserves
1
National parks and reserves--Management
46
Norris Geyser Basin (Wyo.)
2
Obsidian
1
Obsidian Cliff (Wyo.)
2
Oil storage tanks
2
Oiled roads
51
Outbuildings
1
Park buildings
3
Park facilities
43
Parking lots
6
Parks--Employees
2
Pastures
1
Pavements
5
Pavements, Asphalt
1
Pipe
1
Pipelines
1
Plowing
1
Ponds
1
Power shovels
12
Progress photographs
96
Public land roads
2
Quarries and quarrying
1
Ranches
3
Ranger stations
1
Ravines
1
Real property--Maps
1
Recreation area parking facilities
23
Recreation areas--Maintenance
1
Reservoirs
1
Retaining walls
13
Retaining walls--Design and construction
2
Right of way
2
Riprap
2
Rivers
35
Road construction
1
Road construction workers
15
Road drainage
1
Road machinery
60
Road materials
23
Road rollers
12
Road scrapers
3
Roads
206
Roads--Design and construction
1071
Roads--Design and construction--Equipment and supplies
4
Roads--Design and construction--Safety measures
11
Roads--Flood damage
2
Roads--Guard fences
7
Roads--Interchanges and intersections
25
Roads--Maintenance and repair
13
Roads--Surveying
2
Roads--Widening
3
Roadside improvement
1
Rockfills
2
Rocks
13
Rockslides
1
Sand dune management
45
Scenic byways--United States
1
Scenic overlooks
3
Sidewalks
3
Skyline Drive (Va.)
1
Snow
24
Snow removal
1
Snow removal--Equipment and supplies
1
Soil conservation
2
Steam shovels
10
Stone
1
Stone walls
10
Stonemasonry
1
Storm sewers
1
Street gutters
1
Surveying
1
Surveyors
1
Surveys
1
Tankers
6
Telephone lines
1
Tents
3
Topographic maps
4
Tourists
1
Tractors
5
Traffic safety
3
Traffic signs and signals
1
Trails
4
Tree planting
2
Tree stump removal
1
Trees
9
Trucks
8
Tunnels
1
Tunnels--Design and construction
5
Underground pipelines
3
Underpasses
7
United States. Federal Civil Works Administration
1
Upper Geyser Basin (Wyo.)
2
Viaducts
3
Water--Distribution
1
Water-supply
1
Wheelbarrows
1
Wood poles
3
Wooden fences
1
Yellowstone Lake (Wyo.)
4
Yellowstone National Park
161
Location
Place
Adney Gap
2
Afton Overlook
1
Air Bellows Gap
1
Air Bellows Overlook
1
Alum Creek
5
Apollinaris Spring
1
Artist Point
3
Asheville/Oteen maintenance area
4
Avalanche Peak
1
BRLI Floyd Highway Connection
1
Bearwallow Gap
1
Beehive Geyser
1
Big Creek
2
Biltmore Forest
3
Blue Ridge Parkway Overpass and U.S. Route 58
3
Blue Ridge Parkway Overpass on US-18
4
Blue Ridge Parkway Overpass on US-21
1
Blue Ridge Parkway Underpass, Virginia Route 89
8
Blue Ridge Parkway and Coleman Ridge Rd
1
Blue Ridge Parkway over Interstate 77
5
Bluff Mountain Access
2
Bridge Bay
6
Bridge over Virginia Route 638, Blue Ridge Parkway
3
Bridge over Virginia Route 638, Blue Ridge Parkway
2
Bridge over Virginia State Route 52, Blue Ridge Parkway
3
Bridge over Virginia State Route 608, Blue Ridge Parkway
2
Buck Creek
2
Capitol Hill
2
Cascades of the Firehole
1
Castle Geyser
1
Cherry Hill Development, Blue Ridge Parkway
3
Chimney Rock (Silver Peak) Parking Overlook
1
Chittenden Bridge
1
Chromatic Pool
1
Clocktower Creek
1
Craggy Pinnacle
1
Crater Hills
1
Cub Creek
2
Curry Gap
4
Davenport Gap
2
Deep Gap
9
Dingle Creek
1
Dodd Creek Crossing
1
Ducker Mountain
1
Dunraven Pass
3
Eagle Nest Rock
1
Elk Creek
1
Elk Pond Mountain
1
Elkmont Campground
1
Factory Hill
1
Fancy Gap
1
Fancy Gap Sub-Maintenance Area, Blue Ridge Parkway
5
Firehole Canyon
3
Firehole Lake
1
Firehole River
9
Fishing Bridge
4
Forney Creek
2
Fountain Paint Pot
3
Frying Pan Spring
1
Gardiner
12
Gardiner River
1
Gardner Canyon
7
Gardner River
4
Geyser Hill
4
Giantess Geyser
1
Gibbon Falls
2
Gibbon Meadows
1
Gibbon River
4
Gillespie Gap
9
Golden Gate
6
Gooch Gap
2
Grade Crossing
7
Grandfather Mountain
1
Groundhog Mountain
3
Hanging Rock
1
Heart Lake
2
Hemphill Knob
1
Horse Gap
5
Hot Lake
2
Humphreys Gap
12
Indian Creek
1
Indian Gap
1
Indiana Dunes National Lakeshore
1
Inspiration Point
1
Intersection of Blue Ridge Parkway and Virginia Route 612
2
Intersection of Virginia State Route 608 and Blue Ridge Parkway
2
Irish Creek Road Crossing Bridge, Blue Ridge Parkway
4
Irish Gap
6
Junction of Virginia State Route 608 and U.S. Route 52
1
Kepler Cascades
1
Lake Butte Overlook
3
Lake Lodge
1
Ledge Creek
2
Lewis River
1
Liberty Cap
1
Lion Group
1
Little Switzerland
1
Love
2
Love Maintenance Area, Blue Ridge Parkway
1
Lower Otter Creek Overlook
2
Lynn Gap
1
Madison Junction
3
Mammoth
9
Mammoth Cave National Park
526
Mammoth Hot Springs
9
McKinney Gap
1
Messer Gap
2
Metcalf Bottoms
11
Minute Man Geyser
1
Montebello Maintenance Area, Blue Ridge Parkway
4
Mount Everts
1
Mount Mitchell
4
Mount Washburn
1
Niagara
1
Norris Geyser Basin
5
Norris Junction
2
Norris Museum
1
Northwest Trading post, Glendale Springs
3
Obsidian Cliff
4
Obsidian Creek
2
Ocracoke
48
Old Faithful Geyser
1
Old Faithful Lodge
1
Osborne Mountain Overlook
1
Otter Creek Bridge, Blue Ridge Parkway
1
Overpass, Blue Ridge Parkway at Virginia State Route 620
3
Pilot Mountain Overlook
1
Pine Spur Gap
1
Pine Spur Overlook
1
Pipers Gap District
3
Proposed BLRI Boundary Revision 2
1
Proposed BRLI Boundary Revision 3
1
Proposed BRLI Boundary Revision 4
1
Proposed BRLI Boundary Revision 5
1
Proposed BRLI Boundary Revision 6
1
Proposed BRLI Boundary Revision 7
1
Proposed Boundary BRLI Revision 1
1
Puckett Cabin
1
Ramsey Branch
1
Robinson Gap
1
Rockfish Gap
4
Rockydale Quarry Corporation
3
Route 793 Intersection with Blue Ridge Parkway
4
Route 860 intersection with Blue Ridge Parkway
1
Sheepeater Cliffs
1
Sheets Gap Overlook
2
Smart View Overlook
1
Spasmodic Geyser
1
Sponge Geyser
1
Steamboat Point
1
Stewart Knob
1
Swan Lake Flat
1
Sylvan Lake
1
Sylvan Pass
2
Terrapin Hill Overlook
4
Turbid Lake
1
Tye River Gap
6
US Route 220 Intersection with Blue Ridge Parkway
3
Upper Falls of the Yellowstone River
1
Upper Geyser Basin
3
Viaduct-Station 453+00
4
Wagon Road Gap
5
Wagon Road Gap Maintenance area
4
Weasel Creek
1
West Fork Chestnut Creek and Blue Ridge Parkway
1
West Gallatin
1
Whites Gap
1
Yellowstone Lake
4
Yellowstone National Park
160
County
Alleghany County
8
Amherst County
28
Ashe County
11
Augusta County
3
Avery County
1
Botetourt County
4
Buncombe County
11
Carroll County
33
Cocke County
2
Edmonson County
526
Floyd County
6
Franklin County
4
Gallatin County
1
Grayson County
11
Haywood County
6
Hyde County
48
McDowell County
5
Mitchell County
12
Nelson County
16
Park County
265
Patrick County
13
Porter County
1
Roanoke County
10
Rockbridge County
18
Sevier County
13
Swain County
7
Teton County
63
Transylvania County
5
Watauga County
8
Wilkes County
3
Yancey County
4
State
Indiana
1
Kentucky
526
Montana
14
North Carolina
129
Tennessee
15
Virginia
146
Wyoming
315
Country
United States
1146
Type
Still Image
616
Text
308
Medium
architectural drawings (visual works)
295
black-and-white negatives
616
black-and-white prints (photographs)
161
blueprints (reprographic copies)
12
photograph albums
161
reports
1
Rights
No Known Copyright
42
U.S. Government Work
1043
Construction, New Echo River Road, Station 121, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-08-29
Construction, New Echo River Road, Station 88x75, looking south, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-08-29
Construction, New Echo River Road, Station 121, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-08-29
Construction, New Echo River Road, Station 110, looking south, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-08-29
Construction, New Echo River Road, drilling holes for blasting, section 134, looking south, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-08-29
Construction, New Echo River Road, Station 88x75, looking south, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-08-29
Construction, New Echo River Road, Station 95+50, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-08-29
Construction, New Echo River Road, Station 98x75, looking north, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-08-29
Construction, New Echo River Road, Station 95+50, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-08-29
Unidentified road under construction, note blasting in center of photo, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09
Gooch Gap grade separation, Section 2L, Blue Ridge Parkway, NC
Blue Ridge Parkway
Gooch Gap Grade Separation, Sta 467+75, North Carolina Section 2L.
View on map
1938-09-02
ROW adjustment to provide grade crossing, Gooch Gap, Section 2M, Blue Ridge Parkway, North Carolina
Blue Ridge Parkway
ROW Adjustment-Provide Grade Crossing, Gooch Gap, North Carolina Section 2M.
View on map
1938-09-08
Road construction, shovel in operation on New Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09-08
Road construction, shovel in operation on New Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09-08
Road construction, shovel in operation on New Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09-08
Construction, steam roller rolling asphalt on road to utility area, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09-08
Parkway connection to U.S. 421, Section 2F, Station 294 + 00, Blue Ridge Parkway
Blue Ridge Parkway
1938-09-12
Construction, showing utility road after asphalt has been laid and rolled, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09-19
Construction, building headwall for culvert on utility road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09-19
Construction, NP-2 men sloping banks to fill in on New Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09-26
Construction, loading trucks with shovel to make fill on New Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09-30
Construction, gasoline shovel cutting grade and loading dirt on truck to make fill, New Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-09-30
Construction, showing elevation and width and banks of road on north side of river, Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-10-17
Construction, No. 4 men working on new road and getting ready to blast out bank, north side of river on Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-10-17
Road construction, showing how culvert drains New Echo River Road on north side of river, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-11-19
Blue print of Air Bellows parking overlook, Section 2B, Blue Ridge Parkway, NC
Blue Ridge Parkway
Air Bellows Parking Overlook, North Carolina Section 2B.
View on map
1938-11-23
Construction, NP-2 men blasting rock to be used to fill in on New Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-12
Construction, NP-2 men digging out to fill in on lower part of the New Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1938-12
Construction, showing NP-1 graveling road near Demunbrun store, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-01-06
Proposed grade separation plan and elevations at Montebello Road
Blue Ridge Parkway
Virginia, Section 1D.
View on map
1939-01-06
Drawing of line change of Parkway at NC 18 crossing, Blue Ridge Parkway, NC
Blue Ridge Parkway
Line Change - Parkway at NC 18 Crossing, North Carolina Section 2A.
1939-02-15
Grade separation plan, Section 2-F, Sta. 346 + 80, Blue Ridge Parkway
Blue Ridge Parkway
1939-02-20
Grade separation plan, Section 2-F, Sta. 385 + 36, Blue Ridge Parkway
Blue Ridge Parkway
1939-02-21
Grade separation plan, Section 2-F-2, Sta. 652 + 80, Blue Ridge Parkway
Blue Ridge Parkway
1939-02-21
Grade separation plan, Section 2-F-2, Sta. 477 + 29, Blue Ridge Parkway
Blue Ridge Parkway
1939-02-24
Grade separation plan, Section 2-F-2, Station 615 + 00, Blue Ridge Parkway
Blue Ridge Parkway
1939-03-01
Grade Separation Plan, Station 302, Section 2M, Blue Ridge Parkway, North Carolina
Blue Ridge Parkway
Grade Separation Plan, Sta 302, North Carolina Section 2M.
1939-03-02
Grade separation plan, Section 2-F, Station 804 + 80, Blue Ridge Parkway
Blue Ridge Parkway
1939-03-14
Proposed grade separation plan and elevations at Montebello Road
Blue Ridge Parkway
Virginia, Section 1D.
View on map
1939-03-20
Construction, new road leading to new cabin area nearing completion, compacting surface with sheepsfoot roller, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-03-24
Construction, men spreading gravel and smoothing shoulders of road leading to new cabin area, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-03-24
Construction, new road leading to new cabin area nearing completion, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-03-24
Construction, showing bulldozer on the Echo River road moving dirt from cut in hill side to fill, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-04-24
Construction, showing bulldozer on the Echo River road moving dirt from cut in hill side to fill, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-04-24
Construction, Bransford Springs service road looking from sta 7x00 toward 0x00, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-04-27
Construction, using shovel to make cut on new road on south side of Green River near the ferry, 1939.
Mammoth Cave National Park; National Park Service
View on map
1939-05-18
Construction, boys using jack hammer prior to blasting on north side of river on new road, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-05-18
Construction, using scraper to remove dirt on Echo River Road near ferry, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-05-19
Construction, surveying on the new Echo River Road, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-05-25
Construction, making cut with shovel on New Echo River Road, south side of river, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-06-15
Proposed extension of ROW, Section 2M, Blue Ridge Parkway, North Carolina
Blue Ridge Parkway
Proposed Extension of ROW, Sta. 300, North Carolina Section 2M.
1939-06-16
Using gasoline shovel to make large cut on New Echo River Road on south side of Green River, 1939.
Mammoth Cave National Park; National Park Service
View on map
1939-06-20
Wagon Road Gap crossing, Blue Ridge Parkway, North Carolina
Blue Ridge Parkway
Wagon Road Gap P.A., Sta 275, North Carolina Section 2U.
View on map
1939-06-21
Construction, moving dirt near river on Echo River Road, picture taken from south side of river, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-07-20
Construction, using shovel and trucks to make large cut in Echo River Road near Green River, south of river, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-07-20
Construction, using tractor and scraper to grade and fill on new campground and picnic road, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-07-25
Construction, finishing large cut and fill on Echo River Road, on north side of Green River, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-07-26
Construction, smoothing bank on Echo River Road near ferry location, north of river, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-09-07
Construction, using grader to widen driveway at new entrance hotel, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-09-12
Construction, junction of new campground and picnic area road with cabin group road, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-09-12
Construction, making approaches to ferry on Echo River Road, view shows work on both sides of river, taken from south side, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-09-22
Construction, using shovel and grader at new entrance hotel road to move surface of old road, road is to be widened, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-09-28
Alternate lines - Craggy Pinnacle, Blue Ridge Parkway, North Carolina
Blue Ridge Parkway
Alternate Lines - Craggy Pinnacle, Sta 225-255, North Carolina Section 2P.
View on map
1939-10-02
Construction, driveway at new entrance hotel being widened and resurfaced, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-10-13
Construction, showing width of road and how banks are being sloped, north of river on Echo River Road, 1938
Mammoth Cave National Park; National Park Service
View on map
1939-10-17
Green River, showing ferry in operation on Echo River Road, road is now in use, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-11-30
Construction, completed driveway at new entrance hotel, surface was made from large rock bound with dust and water rolled down, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-11-30
Construction, view of ferry now in operation on Echo River Road, note straight gradual descent of approaches on both sides of river, 1939
Mammoth Cave National Park; National Park Service
View on map
1939-11-30
Construction, beginning of Lick Log Road by camp NP-1, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-05-29
Construction, cutting down bank on road at Echo River Ferry, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-05-29
Construction, clearing right of way of Lick Log Road by camp NP-1, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-05-29
Construction, cutting down bank on road at Echo River Ferry, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-05-29
Construction, clearing right of way of Lick Log Road by camp NP-1, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-05-29
Construction, cutting down bank on road at Echo River Ferry, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-05-29
Construction of Lick Log Road looking to southwest, Station No. 22+ 75, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-05-29
Construction, cutting down bank on road at Echo River Ferry, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-05-29
Construction, beginning of Lick Log Road by camp NP-1, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-05-29
Plan and profile of revision of access A at Route 250
Blue Ridge Parkway
Parkway Land Use Maps, Virginia, Section 1B.
View on map
1940-08-17
General layout of Route 60 intersection overpass
Blue Ridge Parkway
General Layout Overpass, US 60, Sta 431, Virginia, Section 1F.
View on map
1940-08-20
Plan and profile of Afton parking overlook
Blue Ridge Parkway
Afton Parking Overlook, Virginia, Section 1B.
View on map
1940-08-23
Parking widenings plan and profile
Blue Ridge Parkway
Parking Widenings, Sta 39 & 263+08, Virginia, Section 1F.
View on map
1940-08-28
Construction, state highway equipment laying an asphalt course on road near Mammoth Cave Hotel, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-09
Construction, beginning new road to picnic area and cabins by NP-1 and NP-4, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-09-22
Construction, beginning new road to picnic area and cabins by NP-1 and NP-4, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-09-22
Proposed relocation of State Highway 220
Blue Ridge Parkway
Virginia, Section 1N.
View on map
1940-09-28
Proposed relocation of State Highway 220
Blue Ridge Parkway
Virginia, Section 1N.
View on map
1940-09-28
Sketch of proposed junction in Love
Blue Ridge Parkway
Sketch - Prop Junct. Pkwy & VA (Proj 53B), Virginia, Section 1D.
View on map
1940-09-30
Black enrollees working on Frozen Niagara Road, 1941
Mammoth Cave National Park; National Park Service
View on map
1940-10
Irish Gap overpass study
Blue Ridge Parkway
Study - Irish Gap Overpass, Sta 0+70, Virginia, Section 1F.
View on map
1940-10-16
Supplementary blueprint of junction at U.S. Route 250 and V.A. Route 609
Blue Ridge Parkway
Virginia, Section 1B.
View on map
1940-10-16
Construction, laying asphalt on Highway 70 near Mammoth Cave Hotel, 1940
Mammoth Cave National Park; National Park Service
View on map
1940-10-24
Tye River Gap grading plan and profile
Blue Ridge Parkway
Virginia, Section 1E.
View on map
1940-10-26
Irish Creek Road intersection plan and profile
Blue Ridge Parkway
Virginia, Section 1E.
View on map
1940-11-05
General layout of Route 60 intersection overpass
Blue Ridge Parkway
Virginia, Section 1F.
View on map
1941-01-15
Construction, laying rock for headwalls on Northtown Road, 1941
Mammoth Cave National Park; National Park Service
View on map
1941-03
Construction, widening Frozen Niagara entrance road, 1941
Mammoth Cave National Park; National Park Service
View on map
1941-03
Construction, laying rock for headwalls on Northtown Road, 1941
Mammoth Cave National Park; National Park Service
View on map
1941-03
General layout of Route 60 intersection overpass
Blue Ridge Parkway
Virginia, Section 1F.
View on map
1941-04-05
General layout of Route 60 intersection overpass
Blue Ridge Parkway
Virginia, Section 1F.
View on map
1941-04-05
Whites Gap crossing plan and profile
Blue Ridge Parkway
Whites Gap Crossing, Virginia, Section 1F.
View on map
1941-04-18
Construction, New Echo River Road, Station 121, 1938
Construction, New Echo River Road, Station 88x75, looking south, 1938
Construction, New Echo River Road, Station 121, 1938
Construction, New Echo River Road, Station 110, looking south, 1938
Construction, New Echo River Road, drilling holes for blasting, section 134, ...
Construction, New Echo River Road, Station 88x75, looking south, 1938
Construction, New Echo River Road, Station 95+50, 1938
Construction, New Echo River Road, Station 98x75, looking north, 1938
Construction, New Echo River Road, Station 95+50, 1938
Unidentified road under construction, note blasting in center of photo, 1938
Gooch Gap grade separation, Section 2L, Blue Ridge Parkway, NC
ROW adjustment to provide grade crossing, Gooch Gap, Section 2M, Blue Ridge ...
Road construction, shovel in operation on New Echo River Road, 1938
Road construction, shovel in operation on New Echo River Road, 1938
Road construction, shovel in operation on New Echo River Road, 1938
Construction, steam roller rolling asphalt on road to utility area, 1938
Parkway connection to U.S. 421, Section 2F, Station 294 + 00, Blue Ridge Parkway
Construction, showing utility road after asphalt has been laid and rolled, 1938
Construction, building headwall for culvert on utility road, 1938
Construction, NP-2 men sloping banks to fill in on New Echo River Road, 1938
Construction, loading trucks with shovel to make fill on New Echo River Road, ...
Construction, gasoline shovel cutting grade and loading dirt on truck to make ...
Construction, showing elevation and width and banks of road on north side of ...
Construction, No. 4 men working on new road and getting ready to blast out ...
Road construction, showing how culvert drains New Echo River Road on north side ...
Blue print of Air Bellows parking overlook, Section 2B, Blue Ridge Parkway, NC
Construction, NP-2 men blasting rock to be used to fill in on New Echo River ...
Construction, NP-2 men digging out to fill in on lower part of the New Echo ...
Construction, showing NP-1 graveling road near Demunbrun store, 1939
Proposed grade separation plan and elevations at Montebello Road
Drawing of line change of Parkway at NC 18 crossing, Blue Ridge Parkway, NC
Grade separation plan, Section 2-F, Sta. 346 + 80, Blue Ridge Parkway
Grade separation plan, Section 2-F, Sta. 385 + 36, Blue Ridge Parkway
Grade separation plan, Section 2-F-2, Sta. 652 + 80, Blue Ridge Parkway
Grade separation plan, Section 2-F-2, Sta. 477 + 29, Blue Ridge Parkway
Grade separation plan, Section 2-F-2, Station 615 + 00, Blue Ridge Parkway
Grade Separation Plan, Station 302, Section 2M, Blue Ridge Parkway, North ...
Grade separation plan, Section 2-F, Station 804 + 80, Blue Ridge Parkway
Proposed grade separation plan and elevations at Montebello Road
Construction, new road leading to new cabin area nearing completion, compacting ...
Construction, men spreading gravel and smoothing shoulders of road leading to ...
Construction, new road leading to new cabin area nearing completion, 1939
Construction, showing bulldozer on the Echo River road moving dirt from cut in ...
Construction, showing bulldozer on the Echo River road moving dirt from cut in ...
Construction, Bransford Springs service road looking from sta 7x00 toward 0x00, ...
Construction, using shovel to make cut on new road on south side of Green River ...
Construction, boys using jack hammer prior to blasting on north side of river ...
Construction, using scraper to remove dirt on Echo River Road near ferry, 1939
Construction, surveying on the new Echo River Road, 1939
Construction, making cut with shovel on New Echo River Road, south side of ...
Proposed extension of ROW, Section 2M, Blue Ridge Parkway, North Carolina
Using gasoline shovel to make large cut on New Echo River Road on south side of ...
Wagon Road Gap crossing, Blue Ridge Parkway, North Carolina
Construction, moving dirt near river on Echo River Road, picture taken from ...
Construction, using shovel and trucks to make large cut in Echo River Road near ...
Construction, using tractor and scraper to grade and fill on new campground and ...
Construction, finishing large cut and fill on Echo River Road, on north side of ...
Construction, smoothing bank on Echo River Road near ferry location, north of ...
Construction, using grader to widen driveway at new entrance hotel, 1939
Construction, junction of new campground and picnic area road with cabin group ...
Construction, making approaches to ferry on Echo River Road, view shows work on ...
Construction, using shovel and grader at new entrance hotel road to move ...
Alternate lines - Craggy Pinnacle, Blue Ridge Parkway, North Carolina
Construction, driveway at new entrance hotel being widened and resurfaced, 1939
Construction, showing width of road and how banks are being sloped, north of ...
Green River, showing ferry in operation on Echo River Road, road is now in use, ...
Construction, completed driveway at new entrance hotel, surface was made from ...
Construction, view of ferry now in operation on Echo River Road, note straight ...
Construction, beginning of Lick Log Road by camp NP-1, 1940
Construction, cutting down bank on road at Echo River Ferry, 1940
Construction, clearing right of way of Lick Log Road by camp NP-1, 1940
Construction, cutting down bank on road at Echo River Ferry, 1940
Construction, clearing right of way of Lick Log Road by camp NP-1, 1940
Construction, cutting down bank on road at Echo River Ferry, 1940
Construction of Lick Log Road looking to southwest, Station No. 22+ 75, 1940
Construction, cutting down bank on road at Echo River Ferry, 1940
Construction, beginning of Lick Log Road by camp NP-1, 1940
Plan and profile of revision of access A at Route 250
General layout of Route 60 intersection overpass
Plan and profile of Afton parking overlook
Parking widenings plan and profile
Construction, state highway equipment laying an asphalt course on road near ...
Construction, beginning new road to picnic area and cabins by NP-1 and NP-4, ...
Construction, beginning new road to picnic area and cabins by NP-1 and NP-4, ...
Proposed relocation of State Highway 220
Proposed relocation of State Highway 220
Sketch of proposed junction in Love
Black enrollees working on Frozen Niagara Road, 1941
Irish Gap overpass study
Supplementary blueprint of junction at U.S. Route 250 and V.A. Route 609
Construction, laying asphalt on Highway 70 near Mammoth Cave Hotel, 1940
Tye River Gap grading plan and profile
Irish Creek Road intersection plan and profile
General layout of Route 60 intersection overpass
Construction, laying rock for headwalls on Northtown Road, 1941
Construction, widening Frozen Niagara entrance road, 1941
Construction, laying rock for headwalls on Northtown Road, 1941
General layout of Route 60 intersection overpass
General layout of Route 60 intersection overpass
Whites Gap crossing plan and profile
Sort (date)
Relevance
Title
Date
Items per page (100):
20
50
100
Page 9 of at least 11
About 1,000 Items
Generously Supported By