Search Results


Page 1 of at least 3
About 44 Items

View:
View of a half finished septic tank, Metcalf Bottoms, Tennessee Great Smoky Mountains National Park Work order No. B-35 GRSM. Concrete septic tank sides after forms were removed. Outlet opening for distribution box line shown at end. Completion report photo.Metcalf Bottoms Sewer system, II-C-MB-7372, Physical Facilities - Campgrounds and Picnic Areas - Metcalf Bottoms
Circa 1962
Leaching field trenches after machine fill, Cable Mill Area, Tennessee Great Smoky Mountains National Park Completion report photo. Machine back fill of leaching field trenches completed.Cable Mill septic tank and leaching trench; Work Order No. B-52 GRSM, II-U-Sewer-7158, Physical Facilities - Utilities - Sewer systems
View of concrete septic tank before backfilling, comfort station under construction in background, Metcalf Bottoms, Tennessee Great Smoky Mountains National Park Work Order No. B-35 GRSM. Concrete Septic tank before backfilling...Comfort station under construction in background. Completion Report Photo.Metcalf Bottoms Sewer system, II-C-MB-7373, Physical Facilities - Campgrounds and Picnic Areas - Metcalf Bottoms
View on map 
Circa 1962
Construction area of septic tank and leaching trench after area seeded, fertilized, and mulched, Cable Mill Area, Tennessee Great Smoky Mountains National Park Completion report photo. Project complete. Area seeded, fertilized, and mulched.Cable Mill septic tank and leaching trench; Work Order No. B-52 GRSM, II-U-Sewer-7161, Physical Facilities - Utilities - Sewer systems
Construction area of septic tank and leaching trench after clean up, Cable Mill Area, Tennessee Great Smoky Mountains National Park Completion report photo. Construction area after removal of rocks, and completion of fine grading and general clean up.Cable Mill septic tank and leaching trench; Work Order No. B-52 GRSM, II-U-Sewer-7160, Physical Facilities - Utilities - Sewer systems
View of manholes of septic tank in foreground, comfort station in background, Cable Mill Area, Tennessee Great Smoky Mountains National Park Completion report photo. Work order No. B-52 GRSM. Machine back fill of septic tank complete. Manholes of septic tank in foreground.Cable Mill septic tank and leaching field, II-U-Sewer-7154, Physical Facilities - Utilities - Sewer systems
Workers setting batter boards for grade control on tank and sewer line connections, Cable Mill Area, Tennessee Great Smoky Mountains National Park Completion report photo. Work order No. B-52 GRSM. Machine excavation for septic tank completed. Setting batter boards for grade control on tank and sewer line connections. Note: The excavations in background for on side of leaching field.Cable Mill septic tank and leaching field, II-U-Sewer-7151, Physical Facilities - Utilities - Sewer systems
View of machine excavation with backhoe for septic tank, comfort station in background, Cable Mill Area, Tennessee Great Smoky Mountains National Park Completion report photo. Work order No. B-52 GRSM. Machine excavation with backhoe for septic tank. Backhoe was also used to excavate for sewer lines and leaching field. Note: Comfort station in background.Cable Mill septic tank and leaching field; Reconstruction, II-U-Sewer-7150, Physical Facilities - Utilities - Sewer systems
View of wall forms for concrete septic tank, worker cutting holes in wall forms for pipe sleeves, Cable Mill Area, Tennessee Great Smoky Mountains National Park Completion report photo. Work order No. B-52 GRSM. Constructing wall forms for concrete septic tank. Outside forms complete, and reinforcement steel in place. Cutting holes in wall forms for pipe sleeves and 4-inch sewer pipe.Cable Mill septic tank and leaching field, II-U-Sewer-7152, Physical Facilities - Utilities - Sewer systems
View of completed septic tank, sewer pipe in the near wall, comfort station in background, Cable Mill Area, Tennessee Great Smoky Mountains National Park Completion report photo. Work order No. B-52 GRSM. Septic tank completed and back fill of sewer line trench and tank started. Note: Sewer pipe in the near wall; comfort station in background.Cable Mill septic tank and leaching field, II-U-Sewer-7153, Physical Facilities - Utilities - Sewer systems
Yellowstone photo album 30, page 79 Yellowstone National Park
Impacts of On-Site Septic Systems to the Water Quality of the Buffalo River near Gilbert, Arkansas National Park Service Water Resources Division; National Park Service
View on map 
2002-01
Utility area layout, residences, Fancy Gap, Blue Ridge Parkway Blue Ridge Parkway Utility Area Layout, Fancy Gap Residences, Virginia, Section 1V.
View on map 
1963-08-08
Covering drain field of septic tank, Deep Creek, Tennessee Great Smoky Mountains National Park Covering drain field.Deep Creek Sewer System, II-U-Sewer-3282, Physical Facilities - Utilities - Sewer systems
Drain field under construction for sewer system, Deep Creek, Tennessee Great Smoky Mountains National Park Drain field under construction.Deep Creek Sewer System, II-U-Sewer-3281, Physical Facilities - Utilities - Sewer systems
Poinsett S.P. 3 Disposal Tanks and Cesspool South Carolina Department of Parks, Recreation and Tourism
View on map 
1935-05-29
Hose leading to septic tank area, Deep Creek, Tennessee Great Smoky Mountains National Park Covering septic tank and drain field.Deep Creek Sewer System, II-U-Sewer-3280, Physical Facilities - Utilities - Sewer systems
Men working on hole for septic tank at Deep Creek, Tennessee Great Smoky Mountains National Park Hole for Deep Creek septic tank.Deep Creek Sewer System, II-U-Sewer-3279, Physical Facilities - Utilities - Sewer systems

Page 1 of at least 3
About 44 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University