Descriptive InformationAn extreme example of the deterioration of the once stable material on the cut slopes. Fallen rocks and fine material have filled roadside gutters and partially blocked the roadway. Frequent removal of this debris, after each heavy rain, was necessary to keep open the drainage and not cause further saturation of the large fills. Work Order No. P-9 Slope stabilization.FOOTHILLS PARKWAY PROJECT 8G3 Slope stabilization, II-R-FHP-6783, Physical Facilities - Roads - Foothills Parkway, Gatlinburg Bypass', Gatlinburg Spur
LocationsGatlinburg Bypass, Sevier County, Tennessee, United States(35.69697,-83.53013)