Descriptive InformationPicture taken from the same position as was used in preceding picture. This shows the layout, as ordered by Mr. Wilhelm and Mr. Ware. The shooting wire shows the alignment. Wall would be difficult to construct and the two curves are in my opinion, unnecessary. The toe-holes are drilled, but would require cement grout and a footer to really give good construction. The wall, top of which is showing, has required the work of 7 men for the past 3 weeks. In that time, a bench 7 feet wide could have been built and completed by now. All the scarring that will be done at this place has been done, and this should not be held as an excuse.Mt. Cammerer Trail; construction, II-Th-5198, Physical Facilities - Trails - Horse Trails