Descriptive InformationFoot trail bridge No. 1, over West Prong of Little Pigeon River, on Chimneys elevation, looking east, work done by CCC, completed in 1936. Cost (in connection with Bridge #2): mandays- $640, materials- $139.02, total- $779.02. NOTE: This bridge in connection with Bridge #2 and should be about 2/3 total cost... downstream elevation., Picture used in Eakin investigation... Chimneys Foot Bridge No. 1 II-F-(1)-10920, Physical Facilities - Footlogs and Bridges - Foot trail bridges, footlogs