Search Results


Page 50 of at least 52
About 2,500 Items

View:
Yellowstone photo album 21, page 3 Yellowstone National Park
Page 76 National Park Service
Groundwater-surface water interaction along the C-2 Canal, Miami-Dade County, Florida Technical publication (South Florida Water Management District (Fla.). Water Supply Department); WS-22; Title from PDF title screen (viewed on September 28, 2009).; "December 2007."; The South Florida Water Management District (SFWMD or District) Water Supply Department participated in this project to support the SFWMD Hydrologic & Environmental Systems Modeling (HESM) Department, and to help quantify the interaction between surface water and groundwater near the C-2 Canal in Miami-Dade County, Florida. The HESM Department requested field measurements along the C-2 Canal near the Southwest, Alexander Orr, and Snapper Creek wellfields to improve the calibration of the SFWMM and the NSM in Miami-Dade County. The investigation focused on trying to quantify the freshwater flow to Biscayne Bay that is being intercepted in the C-2 Canal by pumping from the Snapper Creek, Alexander Orr, and Southwest wellfields. The investigation combined data from different sources to help meet its goals: groundwater levels, surface water levels, wellfield withdrawal data, and stream gauging data.
2008
Yellowstone photo album 23, page 63 Yellowstone National Park
Page 116 National Park Service
Yellowstone photo album 8, page 45 Yellowstone National Park
FCE II Year One Annual Report for NSF Award DBI-0620409 (2007); FCE Annual Reports and Proposals (Statement of Responsibility) Evelyn Gaiser; Mike Heithaus; Rudolf Jaffe; Rene Price; (Citation/Reference) Gaiser, Evelyn; Heithaus, Mike; Jaffe, Rudolf; and Price, Rene, "FCE II Year One Annual Report for NSF Award DBI-0620409 (2007)" (2007). FCE Annual Reports and Proposals. Paper 5. http://digitalcommons.fiu.edu/fce_lter_proposals_reports/5
2007-10
Bridge No. 4, over Indian Flats Prong Great Smoky Mountains National Park Bridge No. 4, over Indian Flats Prong; Dimensions: 3 spans- 21' x 12.5' 21' x 12.5', 20' x 12.5'; width 10.3'; Abutments: log sill on HPRE; Intermediate Support: Rock-filled log crib: Superstructure: 4-14 to 16 log stringers; 3 plank deck; Condition: As a whole, bridge in poor condition; Proposed: Replace with steel stringers, wood deck, 1 span 22' x 12'; Estimate $1, 100,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11176, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 4, over Indian Flats Prong Great Smoky Mountains National Park Bridge No. 4, over Indian Flats Prong; Dimensions: 3 spans- 21' x 12.5' 21' x 12.5', 20' x 12.5'; width 10.3'; Abutments: log sill on HPRE; Intermediate Support: Rock-filled log crib: Superstructure: 4-14 to 16 log stringers; 3 plank deck; Condition: As a whole, bridge in poor condition; Proposed: Replace with steel stringers, wood deck, 1 span 22' x 12'; Estimate $1, 100,Bridge Maintenance Report of 1952 Tre-115, Middle Prong Road, II-F-(5)-11175, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Two views of the horse barn showing dimensions, note silo, photo taken prior to restoration Structures, Exterior H.S. #17 Horse Barn And Silo (X-h. s #20 Silo). Two views of the Horse Barn showing dimensions. Also Note Silo. This photo taken prior to restoration.
View on map 
1972-06-02
Yellowstone photo album 22, page 54 Yellowstone National Park
Yellowstone photo album 4, page 72 Yellowstone National Park
Yellowstone photo album 21, page 67 Yellowstone National Park
Bridge No. 11, over Noland Creek Great Smoky Mountains National Park Dimensions: 2 spans- of 16'x4'; skew 20 degrees; WW 10'; area water-way 120 sq. ft. drainage area 8.5 sq. mi. Abutments: Log cribs reinforced by round timber bents resting on mud sills; Intermediate supports: Bent of 8 to 10, round timber on mud sills; Superstructure: Each span 5 to 10 log stringers, deck 4 hewed slabs; Condition: Bridge is in very poor condition; Proposed: Replace with steel stringers salvaged from other bridges, wood deck, 1 span 40'x4'; Estimate: $2, 500. Bridge Maintenance Report of 1952; FOR-155, Noland Creek Road; Bridge No. 11, over Noland Creek, II-F-(5)-11321, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 17, page 67 Yellowstone National Park
Page 18 National Park Service
Yellowstone photo album 14, page 88 Yellowstone National Park
Yellowstone photo album 17, page 84 Yellowstone National Park
Bridge No. 1, over Straight Fork Great Smoky Mountains National Park Bridge No. 1, over Straight Fork; Dimensions: 8 spans- 16' x 6', 18' x 6', 19' x 6', 20' x 6', 19' x 6', 19' x 6', 19' x 6'; skew 45 degrees; width 12.5'; Abutments: Riprapped log sills; Intermediate Support: 12 x 12 hewed stringers; 3 plank deck; 3 plank runners; Conditions: Deck, poor; runners, fair; wheel guard, poor; caps, rotten; stringers, apparently ok; Proposed: Replace with steel stringers, wood deck, 2 spans 30' x 6'; Estimate: $3, 000,Bridge Maintenance Report of 1952; RAV-142, Balsam Mountain Road, II-F-(5)-11213, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Bridge No. 11, over Noland Creek Great Smoky Mountains National Park Dimensions: 2 spans- of 16'x4'; skew 20 degrees; WW 10'; area water-way 120 sq. ft. drainage area 8.5 sq. mi. Abutments: Log cribs reinforced by round timber bents resting on mud sills; Intermediate supports: Bent of 8 to 10, round timber on mud sills; Superstructure: Each span 5 to 10 log stringers, deck 4 hewed slabs; Condition: Bridge is in very poor condition; Proposed: Replace with steel stringers salvaged from other bridges, wood deck, 1 span 40'x4'; Estimate: $2, 500. Bridge Maintenance Report of 1952; FOR-155, Noland Creek Road; Bridge No. 11, over Noland Creek, II-F-(5)-11320, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Page 23 National Park Service
Dudley Creek horse concession new trail Great Smoky Mountains National Park Start of improved horse trail in right background. Horse barn on left side of photo. This trail provides the connection to the newly-constructed trail system for the horse concession operation. Work Order No. R-20 GSM, roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Trail, II-HC-DC-14309, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
New barn at Dudley Creek horse concession Great Smoky Mountains National Park Construction of horse barn by concessioner. The general area was cleared, filled, and graded before start of construction. Cut slopes, as at left, were fertilized and seeded to prevent erosion. Work Order No. R-20 GSM- roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Barn, II-HC-DC-14310, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
Hindquarters of nubian doe, Cathy, on cement milking stand Carl Sandburg Home National Historic Site Hindquarters of nubian doe, cathy. On cement milking stand with head, not shown, in white wooden stanchion in main goat barn. Leg of another goat is visible. Nine copies, carl 13720-13728. Negative carl 13729. In pencil on reverse, "20 prints this size." The 20 is written over 15.
New drainage at Dudley Creek horse concession parking area Great Smoky Mountains National Park Improved drainage along parking area, and channel extended beyond entrance road to junction with Dudley Creek. Work Order No. R-20 GSM; roads, parking area and trails for horse concession, Dudley Creek.Dudley Creek Horse Concession Parking Area, II-HC-DC-14308, Physical Facilities - Horse Concession Facilities - Dudley Creek Stables
View on map 
1962-11-02
Yellowstone photo album 7, page 115 Yellowstone National Park
Yellowstone photo album 7, page 85 Yellowstone National Park
Yellowstone photo album 31, page 5 Yellowstone National Park
Yellowstone photo album 3, page 69 Yellowstone National Park
Cannon Dry Tortugas National Park; National Park Service Back: ACC 29; I think this is about a 20 pounder. Darnels are Conn. I don't know the caliber of this or the gren at Guilford the pictures do provide a pretty good idea of the carriages regardless of size. They all appear about the same construction.
Yellowstone photo album 13, page 21 Yellowstone National Park
Yellowstone photo album 10, page 18 Yellowstone National Park
Yellowstone photo album 17, page 97 Yellowstone National Park
Tractor and crusher working on road from North Carolina Temp. 284 to Cataloochee campsite, Tractor and Crusher Great Smoky Mountains National Park ECW. Tractor and crusher working on road from North Carolina Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10882, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from North Carolina Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10882, Physical Facilities - Equipment
1935-05
Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite, Tractor and Crusher Great Smoky Mountains National Park ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7. Tractor and Crusher; II-E-10881, Physical Facilities - Equipment;ECW. Tractor and crusher working on road from NS Temp. 284 to Cataloochee campsite. NP-20. Work by side camp from NP-7.Tractor and Crusher, II-E-10881, Physical Facilities - Equipment
1935-05
Yellowstone photo album 11, page 14 Yellowstone National Park
Report to the Governing Board on Regulatory Levels for the Lakes of the Upper Kissimmee Basin DRE-44; REPORT TO THE GOVERNING BOARD ON REGULATORY LEVELS FOR THE LAKES OF THE UPPER KISSIMMEE BASIN; February 20, 1975
1995-02
Bridge No. 1, over Straight Fork Great Smoky Mountains National Park Bridge No. 1, over Straight Fork; Dimensions: 8 spans- 16' x 6', 18' x 6', 19' x 6', 20' x 6', 19' x 6', 19' x 6', 19' x 6'; skew 45 degrees; width 12.5'; Abutments: Riprapped log sills; Intermediate Support: 12 x 12 timber bents on mud sils; Superstructure: 4- 12 x 12 hewed stringers; 3 plank deck; 3 plank runners; Conditions: Deck, poor; runners, fair; wheel guard, poor; caps, rotten; stringers, apparently ok; Proposed: Replace with steel stringers, wood deck, 2 spans 30' x 6'; Estimate: $3, 000,Bridge Maintenance Report of 1952; RAV-142, Balsam Mountain Road, II-F-(5)-11212, Physical Facilities - Footlogs and Bridges - Bridge Maintenance
Yellowstone photo album 16A, page 6 Yellowstone National Park
Yellowstone photo album 21, page 24 Yellowstone National Park
Page 204 National Park Service
Yellowstone photo album 5A, page 77 Yellowstone National Park
Yellowstone photo album 8, page 112 Yellowstone National Park
Yellowstone photo album 10, page 57 Yellowstone National Park

Page 50 of at least 52
About 2,500 Items

Generously Supported By

National Park Service
Institute of Museum and Library Services
Clemson University