Administrative Building, with grass and trees in foreground, hill in the background, 1964Great Smoky Mountains National ParkAdministration Building, II-B-(1)-6845, Physical Facilities - Buildings - Administrative buildings (ranger stations and outbuildings; warden stations; fire towers; checking stations; Geological Survey gauging stations; possession cabin
1964-09
Almond School essay contest winner prize presentation, Gatlinburg, TennesseeGreat Smoky Mountains National ParkAlmond School essay winners: Left to right: Beauford C. Messer, Forney Creek sub-district Ranger; Lee Clampitt, class teacher; W. C. Wikle, school principal; Sandra Lee Wikie, 2nd prize winner ($10,000); Sandra Lee Coffee, 1st prize winner $15.00; Joseph Kulesza, district ranger. Printed in Smoky Mountain Times, June 18, 1959.1959 Essay Contest, IV-Z-7940, Miscellaneous
Applying bituminous prime over compacted aggregate base, Metcalf Bottoms, TennesseeGreat Smoky Mountains National ParkWork Order No. R-13 GRSM. Applying bituminous prime over compacted aggregate base parking area. Completion report photo.Metcalf Bottoms Roads and Parking Areas. II-C-MB-7407, Physical Facilities - Campgrounds and Picnic Areas - Metcalf Bottoms
Apron and drain in the foreground, Sanitray Disposal Station, Smokemont, North CarolinaGreat Smoky Mountains National ParkMobile crane doing final work on resloping a large roadway cut. Work Order No. P-9 Completion report photo,FOOTHILLS PARKWAY PROJECT 8G3 Slope stabilization, II-R-FHP-6786, Physical Facilities - Roads - Foothills Parkway, Gatlinburg Bypass', Gatlinburg Spur
Area where blast was touched off, channel change curve, Oconaluftee River, North CarolinaGreat Smoky Mountains National ParkLooking south on US-441, area where blast was touched off. Construction--blasting of channel change curve Station 582+50 to 583+00...BPR report to Todd.Project 1B8, II-R-1B8-7860, Physical Facilities - Roads - Construction of Project 1B8 on Newfound Gap Road, North Carolina
Attempt to open up the Clingmans Dome Road from Indian Gap to Forney RidgeGreat Smoky Mountains National ParkAttempt to open up the Clingmans Dome Road from Indian Gap to Forney Ridge...Wanted to check conditions of comfort station. The big V-snowplow could not clear off the sections of frozen snow in drifts up to several feet deep,Clingmans Dome Road, II-R-Maint-7782, Physical Facilities - Roads - Maintenance of Roads
Back and side view, new shake roof and boards, John Ownby House, Gatlinburg, Tennessee, 1963Great Smoky Mountains National ParkBack and side view of cabin after completion of work. Note new shake roof and boards in gable end. Work Order No. B-58 rehabilitation of historical structures Completion report photo.John Ownby House; Sugarlands Nature Trail; Building No. 604; Rehabilitation, II-B-(5)-6827, Physical Facilities - Buildings - Historic buildings being preserved
Backside of Cable Mill barn, sidings and sill logs replaced, Cades Cove, Tennessee, 1963Great Smoky Mountains National ParkReplacement of vertical siding boards finished on rear side of barn. Work Order No. B-58, rehabilitation of historical structures; completion photo.Cable Mill Barn Rehabilitation; Building No. 174; Cades Cove, Tenn. II-B-(5)-Cable Mill-6804, Physical Facilities - Buildings - Historic buildings being preserved - Cable Mill Buildings
Backside of Cable Mill barn, sidings and sill logs replaced, Cades Cove, Tennessee, 1963Great Smoky Mountains National ParkSmokemont apron and drain in the foreground, with the water tower" for rinsing the tank and surrounding area behind it. Work Order No. B-57 sanitary disposal stations for travel trailers Completion report photo", Smokemont Travel Trailer Sanitary Disposal station, II-U-TDS-6792, Physical Facilities - Utilities - Travel trailer sanitary disposal
Backside of Cable Mill barn, with mill flume in far background, damaged sidings and foundations observed in foreground, Cades Cove, Tennessee, March 1963Great Smoky Mountains National ParkBack side of barn, with mill flume in far background...Note condition of siding--the long and wide boards. Sill logs, at bottom of siding on either side of large door, have decayed to such an extent that the side is loose. Rock foundations, under sill logs, are missing or ground is eroded and logs are not supported. Work Order ? B-58 GSM, rehabilitation of historical structures: Completion report photo.Cable Mill Rehabilitation; Building No. 174; Cades Cove, tenn, II-B-(5)-Cable Mill-6800, Physical Facilities - Buildings - Historic buildings being preserved - Cable Mill Buildings